• Cuplock Scaffolding with Good Quality in China Market System 1
  • Cuplock Scaffolding with Good Quality in China Market System 2
  • Cuplock Scaffolding with Good Quality in China Market System 3
Cuplock Scaffolding with Good Quality in China Market

Cuplock Scaffolding with Good Quality in China Market

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings.It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification


1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering.


5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q: am i in my rights not to allow the scaffolding to be brought through my living room and kitchen.I have just had a threatening letter from camden council that they will force an entry if I refuse.I have lived here for 33 years and any scaffolding has always gone through the side entrance next door and over the garden wall I am a pensioner and feel I am being harassed
Call your lawyer.
Q: Single double scaffolding distinctionPlease list the sketch map
Rely on the contact surface friction force transmission, that is, by the contact surface of the node after the compression of the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, by tightening the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
Q: It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
Q: Bowl buckle scaffold is not a steel pipe scaffolding
The steel pipe scaffold is mainly used to connect the steel pipe, the specific method is different
Q: What are the requirements for the broken seam connection of bowl buckle scaffold. For example, broken seam on both sides of the vertical pole is very neat, with a steel pipe fastener connection side to connect a number of vertical pole, both sides of the rod is not on a line, but also how to connect?
Bowl buckle scaffold does not require the interface should not be in the same span, and the bowl buckle scaffold is not allowed to mix and match the length of the vertical pole, must use the same height of the vertical pole or cloth from the same vertical pole
Q: I just got a scaffold piercing, Is there anything I can do to make it heal faster?
your just gonna have to wait it out it takes 6-12 months to fully heal. use sea salt and warm water solution to keep it clean that will help it heal a little quicker! just be careful i got to close to a doorjamb and now mine has a bruise its scary looking lol
Q: Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,
Q: THE SCARLET LETTER
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q: Hi ive had my industrial piercing for a while now and ive been wanting to change the barbell, but i cant really find a good place to buy any.Please dont suggest claires or ardenes( cuz there crappy items) i dont want to go to a tattoo parlor and i ve tried going online on PainfulPleasures and purchasing from there but my aunt didnt let....Im getting aggravated because i cant find any place to buy barbells.Can some one please tell where i can buy Barbell earrings at a decent price in Toronto or some where close to Toronto.Thanks in advance...:]Also PLEASE tell me where it is located not just the name of the store ...Please and thank you.:]
actually some claires stuff is good lol. but spencers is where i got mine. if you have one.sometimes at spencers they have deals, i got 4 for $20 i think it was. also culture craze has good ones. theres also hot topic or detox. i hope this helps
Q: Bowl buckle scaffold weight per meter
, heavy 17.07KG. The main component is 48 *, Q235 welded steel pipe

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords