• Cup-lock Scaffolding for High-rise Building with High Performance System 1
  • Cup-lock Scaffolding for High-rise Building with High Performance System 2
  • Cup-lock Scaffolding for High-rise Building with High Performance System 3
Cup-lock Scaffolding for High-rise Building with High Performance

Cup-lock Scaffolding for High-rise Building with High Performance

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Material: Steel (Q235/Q345)
  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

 

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding for High-rise Building with High Performance

Cup-lock Scaffolding for High-rise Building with High Performance

Cup-lock Scaffolding for High-rise Building with High Performance

 

 

 4. FAQ

 

  • How to guarantee the quality of the products?

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery Term?

    Export standerd package or as customer's requirements.

  • Delivery Detail:

    10-25 days after receipt of payment.

Q: Attached to the lifting scaffolding installation site how to write
All obstructions have been removed and all unnecessary restrictions have been removed. Power system can run normally. All the scaffolding bowl bowl has tight connection point.
Q: What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
(5) safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199KN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable.
Q: I would like to ask those who know the specification scaffolding? Can you teach me?
4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, pay attention to not allow foot hand eye parts: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick the wall brick lintel and a beam into a 60 degree angle of the triangle, windows and doors on both sides of brick and 1 3/4
Q: I heard that because of the bicentennial in 2012, a lot of buildings are under renovation. I am worried that when we get there, all the buildings will be under scaffolding and we won't see anything or be able to appreciate the true ambiance of the city. Does anyone know what the city looks like right now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q: Floor type scaffolding construction program is what kind of, what role?
Job requirements;(4) has the advantages of simple structure, convenient assembly and disassembly;(5) according to local conditions, local materials. ?3 load of scaffold, masonry engineering requirements: 2700N per square meter per square meter 2000N, decoration engineering, scaffold in 2500N per square meter per square metre, scaffold 1000N, special circumstances should be determined by calculation. ?4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, attention not allowed to keep the foot hand eye position: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick wall, brick lintel and a beam of 60 degree angle triangle, windows and doors on both sides of the 3/4 brick and 1 brick range?.
Q: Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q: The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
The existing scaffold erection specification is JGJ130-2011 "safety technical specification for the construction of steel tubular scaffold with couplers"; JGJ166-2008 "safety technical specification for the construction of bowl buckle steel tubular scaffolding";
Q: What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
In addition, I did not hear that JGJ166-2008 has a new version of ah
Q: What are the hidden dangers of scaffolding
3, do not approve the construction plan to guide the construction.4, the settlement of the foundation of the ground scaffolding.
Q: truss or frame (?) which is preferred between the two in making scaffoldings and why?
Overall, scafolding is almost always frame because it can be built up in sections and removed for access if needed. The diagonals are bracing, not trusses. Having said that, some scaffolding uses truss pieces (triangular braced parallel rails) to span between posts for increased strength.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches