Scaffolding Steel Kwikstage System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Material: | Surface: | |||
Color: | Size: | Length: | |||
Thickness: | Standard: | kwikstage Scaffolding: | |||
Stable: |
Packaging & Delivery
Packaging Detail: | in bulk or pallet according to customer's requirement kwikstage Scaffolding system standard |
Delivery Detail: | no more than 15days |
Specifications
Best price kwikstage scafffolding
Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport
Kwikstage system
1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Our capability
Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch press,3sets 300t punch press
Produce Technology: stamping/pressing/forging;
Produce Capacity: 500 tons/month
Output: 3000 pcs/day couplers,3000pcs steel plank
Specification
1.Standard:
Thickness(mm):48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0
Length(mm):500/1000/1500/2000/2500/3000/3500/4000
2.Ledger:
Thickness(mm): 48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0
Length(mm):1200/1800/2400
3.Transom:
50mm*50mm*5mm thickness steel angle
Length(mm):600/800/1200/1800
4.Brace(diagonal)
size:48.3*2.5mm thickness steel tube Length(mm): 1830/2750/3530/3660
5.Bace Jack:
Solid Base Jack:38mm(diameter)*650mm (length)or as your request
Hollow Base Jack: 38mm(diameter)*4/4.5/5/6mm(thickness) or as your request
size for reference
Kwikstage Items | Length(mm) | Steel Grade | Theoretical Weight(kg) |
Standard w/o spigot | 3000 | Q235 | 17.5 |
Standard w/o spigot | 2500 | Q235 | 14.5 |
Standard w/o spigot | 2000 | Q235 | 11.5 |
Standard w/o spigot | 1500 | Q235 | 8.5 |
Standard w/o spigot | 1000 | Q235 | 6 |
Standard w/o spigot | 500 | Q235 | 2 |
Ledger 3.2mm | 2400 | Q235 | 9.26 |
Ledger 3.2mm | 1800 | Q235 | 7 |
Ledger 3.2mm | 1200 | Q235 | 5 |
Ledger 3.2mm | 760 | Q235 | 4.3 |
Transom 5.0mm | 2400 | Q235 | 22 |
Transom 5.0mm | 1800 | Q235 | 13.5 |
Transom 5.0mm | 1200 | Q235 | 9.6 |
Transom 5.0mm | 1000 | Q235 | 8 |
Transom 5.0mm | 760 | Q235 | 6 |
Ladder Access Tran | 2400 | Q235 | 11.6 |
Ladder Access Tran | 1800 | Q235 | 15.3 |
Ladder Access Tran | 1200 | Q235 | 24 |
3 Board Stage Bracket | 3000 | Q235 | 9 |
2 Board Stage Bracket | 2000 | Q235 | 6 |
1 Board Stage Bracket | 1000 | Q235 | 2.5 |
Tie Bar | 2400 | Q235 | 7 |
Tie Bar | 1800 | Q235 | 5 |
Tie Bar | 1200 | Q235 | 3 |
Tie Bar | 760 | Q235 | 2.1 |
Double Coupler | Q235 | 1.25 | |
Swivel Coupler | Q235 | 1.25 | |
51mm Double Coupler | Q235 | 1.3 | |
51mm Swivel Coupler | Q235 | 1.3 | |
Putlog/Single Coupler | Q235 | 1 | |
Girder Gravelock Coupler | Q235 | 1.5 |
- Q: My mum tried unscrewing them! But they just wont budge AT ALLSo i have this piece of metal stuck in my ear forever?I'm allowed to change it over.But i can't unscrew the balls?Why wont they unscrew
- Go back to the piercer, they can take it out for you.
- Q: Hi please tell me that when the scaffolding or props should be removed under the concrete slabs.I think that while pouring we r taking sample for compressive strength for 7 days 14 days and 28 days then from that results we have to see the strength and then the supports under the slabes are removed am i right ? if yes then after howmuch strength is required to remove the scaffolding?Another question is that howmuch samples from fresh concrete should be taken for compressive strength?ThanksRashidThanks
- wait 10 days 17 samples
- Q: Where can I find safety standards for Scaffolding?
- ANSI A10.8-2001 Safety Requirements for Scaffolding Scope: Establishes safety requirements for the construction, operation, maintenance, and use of scaffolds used in the construc- tion, demolition and maintenance of build- ings and structures.
- Q: how do i clean my scaffold piercing?
- It depends which piercing you have. Belly button piercing?? Ears? Nose? Tongue? There are different techniques depends on where about your piercing is.
- Q: I have to read quot;The Scarlet Letterquot; by Nathaniel Hawthorne for my AP English class and I have to annotate it. One of the things I have to annotate is quot;the structure of the novel, particularly with the scaffold scenes.quot; Firstly, what do they mean by quot;the structure of the novelquot; an secondly, what is a scaffold scene?
- If you do a google search with the words scaffold scene the results are numerous.
- Q: I know guns are supposed to be unsanitary and not good for you, BUT I want to get an industrial piercing on my left ear and I'm terrified of the needle. I currently have a cartilage (helix) piercing on my right ear that I got done with a gun, it didn't hurt a lot and healed quickly. I just want to know how bad a needle is compared to a gun and whether anybody has gotten an industrial using a gun. Also, if my right cartilage didn't hurt and healed quickly, could I likely expect the same from the two piercings I'll be getting in my left?
- Getting an industrial piercing with a gun isn't possible. Just suck it up and go to a real piercing shop!
- Q: I have just returned from Budapest and was amazed to see that a lot of the scaffolding used there is made of wood and not metal . The construction itself is wonderful and almost an artwork but I cannot see any advantage in using the wood which will rot in time.
- The wood scaffold you talk about is not a working platform. It is put in place to protect people below from falling stonework on old buildings which are waiting for repair. I am sure that when the work can be done it will be replaced by a metal scaffold. As it may be a while before the work can be afforded the wood structure is cheaper to leave in place to keep the public safe.
- Q: with his scaffolding in the way i cannot get any tv at all and i've found out his scaffolding will be there for 6 weeks. there is nowhere else my dish can go.
- wait until he has completed the work.
- Q: Hi there,I got a scaffold piercing done on Sunday and it's become infected (according to my doctor). I've been cleaning it, etc but I caught rather a bad cold which affected it quite badly. It's amazingly sore, swollen and getting worse day by day. My doctor told me to take it out now but also gave me some antibiotics because I said I'd rather not remove it. She said something about the swelling affecting my circulation and that I could always have it done again when I was feeling better. What should I do? Please help me.
- no keep it in you will get over it mine was infected too but that didnt stop me
- Q: righ so im wanting to get my scaffoldin done.....n iv seen lyk some ppl get lyk lumps where its been periced...does this usualy happen..or is it coz the bar is to small or somethingand alsooo.....would it be better to get the bar straight in there or put barbells in it till it healed?
- Sometimes it happen when not fixed properly, and not cleaned well after making the hole. .
Send your message to us
Scaffolding Steel Kwikstage System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches