• Cup-Lock Scaffolding steel System in China Building System 1
  • Cup-Lock Scaffolding steel System in China Building System 2
  • Cup-Lock Scaffolding steel System in China Building System 3
Cup-Lock Scaffolding steel System in China Building

Cup-Lock Scaffolding steel System in China Building

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

2.   Main Features of Cup-lock Scaffolding

1.A full set of Cup Lock Scaffolding Parts offered

2.High Bearing capacity and simplicity
3.Simple and officient to assemble

4.Custom Made is available


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

1. Less lost: There is not scattered coupler, it can be reduced the least for the component.

 

2. Less maintenance: It is connected without the bolted, there is no to maintain.

 

3. Easy to manage: Components are neatly stacked and manufactured standard, it’s easy to manage on site and satisfied with civilized construction requirements at same time.


5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q:Is there any other stores that are like Home Depot that sales building materials and scaffold?
I do not know where you live, but we also have a Menard's and Lowes. They both sell building materials.
Q:Single double scaffolding distinctionPlease list the sketch map
1) a single standard steel scaffolding steel pipe. It uses only one standard, such as steel tubular scaffolding, welded steel pipe using only 48.3 * 3.5.2, a variety of specifications of steel scaffolding, which consists of more than two kinds of different specifications of the steel pipe, such as door scaffolding3) steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding. A bowl type steel tube scaffold when using steel bar when the "scaffolding" when using the single pipe; take the side of the steel bar, "steel based scaffolding".
Q:i mostly need forest tho!
The forest in the novel is a symbol of darkness and gloom where evil is. In Puritan times, the forest was the devil’s playground and no good shall come from it. “How the black man haunts the forest, and carries a book with him- a big, heavy book, with iron clasps; and how this ugly Black Man offers his book and an iron pen to everybody that meets him here among the trees.” (Hawthorne 178) The witch of the town, Mistress Hibbins, knows they have been to the forest and have talked of escaping. This symbolizes the powers brought to her by the devil or “Black Man.” Not only does Mistress Hibbins know of the secret, she attends to the forest regularly, showing the powers of evil. From knowing that the forest is evil and nothing good shall come from it, Hester and Dimmesdale seem to scheme of a plan to escape the town without his redemption. The brook talked about in the novel is also symbolic in that it travels through the forest, like gloom. When Hester removes the “A” it becomes a boundary that separates the world she knows from the world without the “A.” As a symbolic setting used in Nathaniel Hawthorne’s, The Scarlet Letter, darkness and gloom interpret the forest.
Q:i had an industrial piercing 2 days ago and was just wondering roughly how long untill i can change the bar? ive seen a few i like and want to change the boring one asap,..also, do u think my ears look crowded??? i dont have any pictures but on my left ear i have earlobe, tragus and rook, and my right ear i have ear lobe, anti-tragus and industrial..just wondering what u think.. thankss x
4-6 weeks isn't long enough. You have two fresh piercings that are connected to each other which gives you a bit more of a high risk of one not healing properly. You need to give your body time to let the holes fully heal. Take it from someone who took out her industrial bar 3 months into having it to clean it and had the top hole close up. You really should give it at least 6 months if not longer to fully heal.
Q:PLEASE HELP!!!
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:What is the tension in each wire?a.Left wire = 40 N; right wire = 160 Nb.left wire = 200 N; right wire = 80 Nc.Left wire = 160 N; right wire = 40 Nd.Left wire = 240 N; right wire = 120 NThank You!
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.A. frame protectionB. loadC. foot plateD. bar lockE. frame stability
The correct answer is: C, D, E optionsThe bowl buckle type steel pipe scaffold inspection and evaluation guarantee project includes
Q:I would like to ask what is the erection of external wall scaffolding specification? What do you need to pay attention to?
What is the outer wall scaffolding erection specification: there are several following rn note: in our daily life, it is necessary. That is what to do with it, rn for home improvement, in the end how much help?
Q:on a scale of 1-10
Are you seriously asking that question?
Q:Standard Specification for bowl type scaffold steel pipe diameter
According to the specification requirements of every three vertical and horizontal cross set with scissors support; height of more than 8 meters in the low to vertical, vertical and horizontal set of scissors. Generally speaking, the technical requirements of the roof beam, the coupling beam parts are independent support, whether the existence of suspension.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches