Hot-dipped Cup-Lock Scaffolding best System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Brand Name: | ADTO | Model Number: | CPS | ||
Material: | Q235,Q345 | Delivery Time: | Within 20 days after prepayment received | Payment Term: | T/T,L/C |
Packaging & Delivery
Packaging Detail: | In bundle by steel strip or in waterproof packing |
Delivery Detail: | Within 20 days after receive the L/C or Deposit |
Specifications
Cup-Lock Scaffolding System for applications as formwork support,general access scaffold,staircase tower,mobile tower,table form
Cup-Lock Scaffolding System
The unique node locking method which allows up to four horizontal members to be fastened to a vertical member in one action by a single hammer blow - without the use of nuts and bolts or wedges.
Components: Cup-Lock Standard With Spigots, Cup-Lock Ledger, Cup-Lock Diagonal Brace, Top & Bottom Cup, Blades, Steel Plank, Steel Stair Case and Steel Base Jack.
Product Feature:
-Simple. Components allow the easy creation of cantilevers, inside platforms and stair cases.
-Lighter. 20% lighter than Coupler & Pin Scaffolding System
-Safe to erect and use
Cup-Lock Standard/ Vertical
Standard with Spigots
Description | Weight |
1.0M Cup-Lock Standard, Hot Dipped Galvanized | 5.5kg |
2.0M Cup-Lock Standard, Hot Dipped Galvanized | 11.4kg |
3.0M Cup-Lock Standard, Hot Dipped Galvanized | 16.6kg |
Cup-Lock Standard Without Spigots
Description | Weight |
0.4M Cup-Lock Standard, Hot Dipped Galvanized | 2.4kg |
0.8M Cup-Lock Standard, Hot Dipped Galvanized | 4.6kg |
1.3M Cup-Lock Standard, Hot Dipped Galvanized | 6.6kg |
1.8M Cup-Lock Standard, Hot Dipped Galvanized | 9.1kg |
2.3M Cup-Lock Standard, Hot Dipped Galvanized | 11.6kg |
- Q: I want to know the classification of scaffolding in the building
- Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
- Q: What are the requirements for the construction of the scaffold eye in the building?
- The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
- Q: How to calculate the rental price of portal scaffolding
- Under normal circumstances, the small local rental price: 2.5-3.0 yuan / set / day
- Q: When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
- Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
- Q: Which God can tell me what is required, how to get ah?
- Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
- Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- I'd give it a decent amount of time before changing it. They take awhile to heal, often times for most between 6-12 months, but for most it's closer to the 12. So I'd give it a few months at least, but it wouldn't be a bad idea to ask your piercer about when would be the best time. Often times too they'll help you with changing jewelry jewelry insertion for little to no charge, so you may want to do that. I've had mine pierced for about 12 yrs, and actually, I still have the original bar in that it was pierced with, but I remember it was quite a while before I felt comfortable taking it all the way out to clean.
- Q: So, 12 Days Ago I Went To Blue Banana To Get Scaffolding On My Right Ear. Everything Went Fine And They Did A Brilliant Job. I Clean It With Sea Salt Soaks 2-3 Times A Day And Use A Bit Of Tea Tree Oil After To Help Sooth. I Was Just Wondering From People Who've Experienced This Piercing How Long It Took For Yours To Stop Hurting And The Time It Took For The Swelling To Go Down (: Thank You lt;3
- No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
- Q: Introduction of external scaffolding
- Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
- Q: Which accessories are included in a movable scaffold
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Send your message to us
Hot-dipped Cup-Lock Scaffolding best System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords