building steel hex nut casted/formwork tie rod nut/formwork building systems
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
color: |
Packaging & Delivery
Packaging Detail: | Crates,or Pallets, or Big bags,or Customed following customer |
Delivery Detail: | 20days |
Specifications
1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron
1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron
5.Supply Ability: 50000 sets per month
6.Custom Made: Available
Our main products involve the Wing Nut, Formwork Clamp, Nut, Base Jack Nut, Slope Plate, Walter Plate, Pressed Plate, Tie Rod, Scaffolding Coupler, Round Coupler, Pins, Washers, Steel Cone, Iron Cone, Concrete parts, Lock Nut, Flanged Wing Nut, Anchors, Lifting Anchors, Sockets, Lifting Clutch, Recess Former and other casted and pressed Formwork Accessories, Scaffolding Accessories etc.
Our selling network spread all over the world, the current main customers come from the Europe, the Middle East, the America and the Africa.
1. We are one of the biggest factory on formwork and scaffolding accessories
2. We have more than 10 years experience on manufacturing and exporting.
3. We have the advanced equipment and process flow and excellent quality control.
4. We have the competitive price.
5. We have the completed sales and service team so that we can offer the best service
- Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
- I agree with A Silent Reminder - They're the same thing, just called something different in different places. I find that people in the U.S call it an Industrial, and those in England call it a Scaffold.
- Q: How to calculate the double wall scaffolding
- The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
- Q: Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
- They make Cena look like Kurt Angle in there!
- Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
- Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
- Q: i just need to know the age limit with parental permission?
- I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
- Q: 21M high full scaffold erection scheme
- 2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- (3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
- Q: scaffold, where to buy?
- Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
- Q: Because my friend wants it done but isn't sure :)
- Old enough to spell PIERCED right. <3
- Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- i heard from people after a year an industrial still hurts and they usually have to take them out
Send your message to us
building steel hex nut casted/formwork tie rod nut/formwork building systems
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords