EN74 & BS1139 standard cuplock scaffolding system 1
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | |||||
Type: | Material: | Surface: | |||
Color: | Size: | Thickness: | |||
Standard: | scaffolding system: | cuplock system: | |||
Stable: |
Packaging & Delivery
Packaging Detail: | in bulk or pallet according to customer's requirement cuplock stanard scaffolding system |
Delivery Detail: | no more than 15days |
Specifications
Best price cuplock scafffolding
Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport
Cuplock Scaffolding
1.Comperticative price
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Specification
Product name | Cuplock scaffolding |
Components | standard ,ledger,diagonal , top cup, bottom cup, Ledger Blade |
Material | Q235/345/195 |
Surface | galvanized, Hot dip galvanized, Painted |
color | red paint, blue paint, yellow paint, green paint, bright galvanized |
size | Steel pipe diameter is 48.3mm Thickness :2.75/3.0/3.2/3.25/4.0mm standard Length:0.5/1.0/1.5/2.0/2.5/3.0M Ledger length:0.6/0.9/1.0/1.2/1.5/1.8 |
usege | Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc |
Packing | Bulk or Bundle with steel strip |
Size:
Standard Ø48.3×3.25 Q345 | Ledger Ø48.3×3.25 Q235 | Diagonal Ø48.3×3.25 Q235 | |||
Size/mm | Weight/kg | Size/mm | Weight/kg | Size/mm | Weight/kg |
500 | 3.45 | 600 | 2.54 | 1300×2000 | 9.21 |
1000 | 5.58 | 900 | 3.60 | 1800×2000 | 10.31 |
1300 | 7.97 | 1000 | 4.10 | 2500×2000 | 12.16 |
1500 | 8.74 | 1200 | 4.70 |
|
|
1800 | 10.60 | 1250 | 5.00 |
|
|
2000 | 11.38 | 1300 | 5.20 |
|
|
2500 | 14.00 | 1600 | 6.30 |
|
|
3000 | 16.63 | 1800 | 7.00 |
|
|
|
| 2500 | 9.54 |
|
|
- Q: Standard for inspection of portal scaffolding
- The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
- Q: Mobile scaffolding accessories prices
- The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
- Q: Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
- Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
- Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
- Q: If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
- tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
- Q: Can you do the outer scaffolding?
- The safety net is fixed on the side of the outer vertical rod of the scaffold. (2) the 16# wire safety net, strict and smooth. (3) the outer side of the scaffold shall be provided with a 1.2m high protective railing and a 30cm high skirting bar, and the top row protective railing shall be not less than 2, with a height of 0.6m and 1.2m.
- Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
- Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
- Q: Scaffold removal should comply with those requirements......
- Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: Bowl buckle type steel pipe scaffolding should set up a few people
- The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.
Send your message to us
EN74 & BS1139 standard cuplock scaffolding system 1
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords