Cup-lock Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | cup-lock scaffolding: | ||||
scaffolding system: |
Specifications
Name:Cup-lock scaffolding
Surface Treatment:Painting
Fitting Name:Ledger and Standard
Color:Red
Package:Steel Pallet
Name: cup-lock scaffolding, cuplock scaffolding,cup lock scaffolding,cup-lock scaffolding,cuplock system scaffolding,scaffolding cuplock
Surface Treatment: Painting
Fitting Name: Ledger and Standard
Color: Red
Package: Steel Pallet
Size For Standard :
Product Name | Specifications(mm) | Weight(kg) |
Standard | 3000*48*3.0 | 15 |
Standard | 2400*48*3.0 | 12.47 |
Standard | 1800*48*3.0 | 9.57 |
Standard | 1200*48*3.0 | 6.66 |
Standard | 600*48*3.0 | 4.67 |
Size For Ledger :
Product Name | Specifications(mm) | Weight(kg) |
LEDGER | 2400*48*3.0 | 8.44 |
LEDGER | 1800*48*3.0 | 6.43 |
LEDGER | 1500*48*3.0 | 5.43 |
LEDGER | 1200*48*3.0 | 4.43 |
LEDGER | 900*48*3.0 | 3.44 |
LEDGER | 600*48*3.0 | 2.43 |
LEDGER | 300*48*3.0 | 1.44 |
Chinese OEM for cup lock scaffolding systems !! With high quality and Competitive Prices !!
- Q: It's for my science assignment and I can't find the answer. Please help!! :)
- It is a way of making a bone strong enough to support body weight without having to be solid heavy bone.
- Q: I would like to ask the bowl buckle scaffold operating layer is what?
- The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role.
- Q: Explain the principles of scaffolding?
- Well first you open a book, then you do your own homework. And yes I work on scaffolding regularly.
- Q: I heard that because of the bicentennial in 2012, a lot of buildings are under renovation. I am worried that when we get there, all the buildings will be under scaffolding and we won't see anything or be able to appreciate the true ambiance of the city. Does anyone know what the city looks like right now?
- Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
- Q: A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
- Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
- Q: A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
- Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
- Q: I'm getting scaffolding put up round my house. Its a Normal size house and its being put up all round the four walls to the top. will it be put up in 2 hours or more? or less? I have no clue please help me.Thanks!
- all depends how many guys are putting up the scaffold but I would say more than two hours
- Q: It's not fixed to the building and it looks as though a heavy gust of wind would send it crashing down. How exactly does scaffolding stay up and not topple over?
- Well, it is attached to the building - not very strongly, but enough to keep it directly over the feet. The feet are adjusted to keep the part above them vertical so forces are straight down - easily achieved with a plumb bob on a string parallel to the pipes. Many scaffolding installations extend around a corner and with the diagonal bracing built in that provides stiffness. And scaffolding for working on a building is protected by the building, which blocks the air flow and slows it down from in the open air. Scaffolding towers, such as lighting at a concert or other special event (golf tournament) are guyed with wires/cables going out at an angle to anchors in the ground - these are often nearly invisible at any distance.
- Q: What are the requirements for the removal of scaffolding
- For example, fastener type scaffolding, demolition should be met: 1, the demolition work must be from top to bottom layer, the upper and lower non simultaneous operation of 2, the wall must be removed with the scaffolding layer by layer, even the non first wall pieces of the whole layer or several layers removed after removal of the scaffolding dismantled; height should be less than 2 step, such as the height difference is greater than 2 steps should be added to the reinforcement of diaphragm wall
- Q: If the guillotine operator walked away from the scaffold where would he be headed?
- lol, i have no answer for this...just laughter..
Send your message to us
Cup-lock Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords