• Aluminium scaffold tower Scaffolding System 1
  • Aluminium scaffold tower Scaffolding System 2
Aluminium scaffold tower Scaffolding

Aluminium scaffold tower Scaffolding

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Aluminum Scaffolding are new assorted aerial working production , are developed and inland custumer’s characters , its advantages are light weight , convenience to build , many kinds combination , big platform area , flexible to move .

It Can afford to many people work on the platform at the same time , increase the work efficiency largely , widely used for hotel , office sports ground , theater , hall cinema , construction company and so on , its special toy bricks build style , can meet many kinds complex work conditions .

The rapid aluminum scaffolding accord with Europe HD1004 safety standard , work height range from 2M to 40M , Flexible to assemble , rapid to load and unload , can save cost and easy storage , its light weight , prevent oxidation and fire , easy to maintain .

The Aluminum scaffolidng good point as following :

1,Light weight

It is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.

2,Safe and firm structure

It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg

3,Easy assembly and dismantlement

It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.

4,Easy transit

It has castors so that it can be moved and locked easily and work at different place.

5,High applicability

It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.

6,Flexible assembly

It can be designed and assembled according to any operation request of any special maintenance in all working sites.

7,Rust-proof,Corrosion- proof,Maintenance-free

All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years

MeasurementsAluminum Scaffolding have two types :

1. Double Width uprightness climb ladder scaffolding

Double width(135cm)

135cmx200cm

height

2M-40M

Carrying capacity(each floor)

300 kg

Total carrying capacity

900 kg

Material

Aluminum alloy 6082

Thickness

2mm or 3mm

2. Single Width uprightness climb ladder scaffolding

Single width(75cm)

75cmx200cm

height

2M-40M

Carrying capacity(each floor)

272 kg

Total carrying capacity

900 kg

Material

2mm or 3mm

Packing : Standard Export packing by carton

Delivery day : 10days


Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
2, operating conditionsAccording to the engineering characteristics and construction requirements of the scaffolding erection scheme.The shelf position has to clean up the site.On the soft soil foundation has been hardening.
Q:would a scaffold piercing look gay on a guy?
No i think that would be hott!!! :)
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
Advantages and disadvantages of bowl buckle scaffold(1) multi function: according to the specific requirements of construction, composed of different group frame size, shape and bearing capacity of single and double row scaffolding, supporting frame, support columns, material lifting frame, climbing scaffolding, cantilever frame construction equipment and other function. Can also be used to set up construction shed, shed, lighthouse and other structures. The utility model is especially suitable for building curved surfaces and heavy load support frames.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
She was only on it once officially but there are several appearances in the book.
Q:What are the requirements for the construction of the scaffolding structure?
One of the platforms has access to the lower part of the scaffolding structure. The scaffold structure also includes a ladder that is mounted to the scaffold for the worker to pass through the opening. And the scaffold structure comprises a fixed to additional bamboo grid frame, the frame of the gate is composed of an outer bearing component and a bamboo piece composed of bearing components within the compartment is smaller than the grid spacing
Q:Cells from an animal's muscles are processed with chemicals and they grow. The cells are transferred to a metal scaffold and are stimulated physically. In a few months, you have a big block of meat which can be ground and cooked. What do you have to add? Does this innovation mean the price of meat will become a very minor expense?
Sounds weird. When eaten I wonder how this experiment would affect the human body. It just might turn normal people into Liberals. If that's the case then I don't want anything to do with it.
Q:Hi(: My names Tasha, and I love piercings. (I have 8) And I want to get an industrial piercing(Some call it a scaffold). But my ear doesn't have a bend like most people do.I got my first four piercings done by a professional. But felt I was much more comfortable having my brother(22) do it. Since he's someone I know, and hes done piercings and stuff before.
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords