Aluminium scaffold tower Scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Aluminum Scaffolding are new assorted aerial working production , are developed and inland custumer’s characters , its advantages are light weight , convenience to build , many kinds combination , big platform area , flexible to move .
It Can afford to many people work on the platform at the same time , increase the work efficiency largely , widely used for hotel , office sports ground , theater , hall cinema , construction company and so on , its special toy bricks build style , can meet many kinds complex work conditions .
The rapid aluminum scaffolding accord with Europe HD1004 safety standard , work height range from 2M to 40M , Flexible to assemble , rapid to load and unload , can save cost and easy storage , its light weight , prevent oxidation and fire , easy to maintain .
The Aluminum scaffolidng good point as following :
1,Light weight
It is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.
2,Safe and firm structure
It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg
3,Easy assembly and dismantlement
It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.
4,Easy transit
It has castors so that it can be moved and locked easily and work at different place.
5,High applicability
It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.
6,Flexible assembly
It can be designed and assembled according to any operation request of any special maintenance in all working sites.
7,Rust-proof,Corrosion- proof,Maintenance-free
All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years
MeasurementsAluminum Scaffolding have two types :
1. Double Width uprightness climb ladder scaffolding
Double width(135cm) | 135cmx200cm |
height | 2M-40M |
Carrying capacity(each floor) | 300 kg |
Total carrying capacity | 900 kg |
Material | Aluminum alloy 6082 |
Thickness | 2mm or 3mm |
2. Single Width uprightness climb ladder scaffolding
Single width(75cm) | 75cmx200cm |
height | 2M-40M |
Carrying capacity(each floor) | 272 kg |
Total carrying capacity | 900 kg |
Material | 2mm or 3mm |
Packing : Standard Export packing by carton
Delivery day : 10days
- Q: Whats a scaffold in ac brotherhood?
- Wrong category. Post under Video and Online Games.
- Q: Please help me in building professional people (scaffolding)
- Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
- Q: Exterior wall scaffold construction plan?
- Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
- Q: If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
- tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
- Q: Cantilever beam type scaffolding can not exceed the maximum number of not married
- The surface of the board and the bottom of the board should be treated with additional reinforcement.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the perimeter of the safety net enclosure and high altitude installation components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc..
- Q: Topic?Scaffolding construction program how to doSpecial construction scheme
- More recently asked scaffolding people, I made a standard answer to see if you have any useful (already adopted)
- Q: How to remove the disc scaffolding ah, do not know how to get through the decoration
- First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
- Q: The basic form of external scaffolding
- The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
- Q: Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
- The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
- Q: Fastener type steel pipe scaffold composed of which components?
- Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Send your message to us
Aluminium scaffold tower Scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords