best price Cup lock scaffold cuplock system scaffolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | 1500 | ||||
Size: | Customized | Material: | Q235,Q345 | MOQ: | 2000 sets |
Surface finish: | Powder coated,galv or HDG | Using life: | 4-5 years | Technical: | Cutting,Welding,Derustin,Paint |
Dimentions: | 48.3*3.25mm | Quality: | Good bearing/Durable/Stable |
Packaging & Delivery
Packaging Detail: | by steel pallet |
Delivery Detail: | 20 days upon prepayment |
Heavy Duty Rigid Modular Cup Lock Scaffolding For Bridge
Feature
1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.
2. Cuplock scffolding is made by Q235 steel which is strong and durable.
3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.
4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc.
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends.
Specification
Item Name | Cuplock Scaffolding | |
Brand Name | Queen | |
Raw Material | Q235 /Q345steel Grade | |
Components | Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade | |
Surface finish | Electric Galvanized/HDG/Powder coated | |
Size | Pipe size:48.3mm | |
Thickness:3.25mm | ||
Usage | Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building | |
Packing | By Steel pallet or bulk | |
Standard | 48.3*3.25*500mm | 3.5kg |
48.3*3.25*1000mm | 5.6kg | |
48.3*3.25*1300mm | 8.0kg | |
48.3*3.25*1500mm | 8.75kg | |
48.3*3.25*1800mm | 10.6kg | |
48.3*3.25*2000mm | 11.4kg | |
48.3*3.25*2500mm | 14.0kg | |
48.3*3.25*3000mm | 16.70kg | |
8.3*3.25*4000mm | 20.36kg | |
Ledger | 48.3*3.25*650mm | 2.54kg |
48.3*3.25*914mm | 3.6kg | |
48.3*3.25*1065mm | 4.10kg | |
48.3*3.25*1150mm | 4.7kg | |
48.3*3.25*1570mm | 5.76kg | |
48.3*3.25*1829mm | 6.62kg | |
48.3*3.25*2130mm | 7.62kg | |
48.3*3.25*2438mm | 8.24kg | |
48.3*3.25*3050mm | 10.68kg | |
Diagonal brace | 48.3*3.25*915mm | 3.4kg |
48.3*3.25*1150mm | 4.04kg | |
48.3*3.25*1572mm | 5.34kg | |
48.3*3.25*1829mm | 6.13kg | |
48.3*3.25*2130mm | 7.06kg | |
48.3*3.25*2438mm | 8.01kg | |
48.3*3.25*3050mm | 9.90kg | |
Steel Plank | 210*45*1.2*1000/2000/3000/4000 | |
250*50*1.2*1000/2000/3000/4000 | ||
Screw jack base | 38*4.0*500mm | 3.35kg |
38*4.0*600mm | 3.65kg | |
48*4.0*600mm | 4.4kg | |
35*500mm | 4.5kg |
- Q: Whats a scaffold in ac brotherhood?
- Wrong category. Post under Video and Online Games.
- Q: Mobile scaffolding accessories prices
- ! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
- Q: Can you do the outer scaffolding?
- The safety net is fixed on the side of the outer vertical rod of the scaffold. (2) the 16# wire safety net, strict and smooth. (3) the outer side of the scaffold shall be provided with a 1.2m high protective railing and a 30cm high skirting bar, and the top row protective railing shall be not less than 2, with a height of 0.6m and 1.2m.
- Q: Cantilever beam type scaffolding can not exceed the maximum number of not married
- An overhanging canopy should be the pillars of the non overhanging balcony canopy may be concave balcony, may also be the pillars of support (pretty much before the home house) pick style balcony canopy should be the cantilevered balcony canopy is not that direct pick out in the post
- Q: Topic?Scaffolding construction program how to doSpecial construction scheme
- More recently asked scaffolding people, I made a standard answer to see if you have any useful (already adopted)
- Q: what is the height of a scaffold if the person is 6ft tall?
- Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
- Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
- Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
- im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!
- Q: Fastener type steel pipe scaffold composed of which components?
- Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Send your message to us
best price Cup lock scaffold cuplock system scaffolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords