• US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp System 1
  • US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp System 2
  • US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp System 3
US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Standard:
ANSI/SSFI SC100-5/05
Grade:
8.8
Flange Nut:
22mm
Type:
US Type
Weight:
1.7kg
Size:
48.3*48.3mm
I-bot:
M14-92mm

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp


1. Product Detail:

Size

48.3*48.3mm

Weight1.7kg/pc
I-BoltM14-92mm
Flange Nut22mm
SurfaceElectro-galvanized/HDG


2. Company Introduction

        We are a professional manufacturer of scaffolding couplers and scaffolding accessores, there are 4 forging lines in our workshop and we have our own mould machines and technicians , could meet different requests from clients. OEM also available.  All our products are made according to international standard EN74-1:2005/BS1139 and AS1576.2-2009 and we own the test machine in our factory to control the quality.

        Welcome to our factory anytime you want.


Factory View:

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp


US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp


Product Details:

A. BS Type Double Coupler and Swivel Coupler 

B. German Type Double Coupler and Swivel Coupler 

C. US Type Double Coupler and Swivel Coupler

D. Italian Type Double Coupler and Swivel Coupler

E. Putlog Coupler/Single Coupler

F.  Board Retaining Coupler

G. Fixed Beam Clamp

H. Swivel Girder Coupler

I.   Sleeve Coupler

J.  Bone Joint

K. Jack Nut

L.  Forged Wing Nut and so on.......


Pictures of US Type Swivel Coupler/Swivel Clamp

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp



Remarks:

1. Packing: Woven bags+steel pallet or other shipping standard

2. Leading time: Reguarly 25-30 days after receving advanced payment or according to your qty.

3. Payment Term: 30% advanced payment by T/T, 70% balance against copy of BL .


Packing Picture:

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp

US Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler/Swivel Clamp


For more informaiton, please keep in touch with Bella.

Hope to work with you together in the near future.

Thanks .






Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:How to calculate the vertical force of scaffolding
The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
Q:Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q:Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
Q:How to calculate the fastener type steel pipe scaffold
1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
Q:i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
sounds like what your doing is fine. just keep it clean that's basically all you can do.
Q:Was thinking of getting one. How much do they cost?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q:On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:I've had my scaffolding piercing for about a week now and when cleaning i've just dabbed the hydrogen peroxide and salt water around my ear. However i read that i should be rotating it when cleaning it. Should i rotate it after only a week?
you dont need to rotate a scaffolding piercing because its in such a place that it will rotate on its own throughout the day/night
Q:What are the requirements for the sampling inspection of scaffolding?
Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords