Galvanized Steel Plank for Cuplock Scaffolding System
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 2000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Galvanized Steel Plank
Ringlock Scaffolding system is also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity. Ringlock System Scaffolding Standard for Construction is a tube of D48*3.5mm which material is Q235/Q345B, Galvanized Ringlock System Scaffolding 。Ledger for Construction is made by a tube with two wedge welded on the ends separatel,Galvanized Steel Plank by pre-galvanized steel
Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately
Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.
We can supply various scaffoldings of different types in superior quality at the best price with best service!
2.Main Features of Galvanized Steel Plank
Reliable performance
Corrosion resistance
Durable finish standards
Strong anti-sliding performance
Manugacture
Good service
3. images of Galvanized Steel Plank
4. Specification of Galvanized Steel Plank
Raw Material: steel
Size: 500-3000 mm or customer demanded
Certifies:, Element
Technology : Forging / welding
Surface treatment: Electro galvanized, Hot DIP galvanized, or painted
Brand Name:FF
Useage: connecting the scaffolding pipe
OEM service offered
5.FAQ of Galvanized Steel Plank
Why you choose us ?
1)Highest quality -never use any equipment that is damaged or deteriorated in any way
2)Safety -inspect all equipment before using
3)Competitive price - factory suppler direct
4)We have strong engineering team that can give best solution for your project
5)Cutting -Edge product development
Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances
Our firm belief that our customer's success are the only guarantee of our success .
Package ?
All the products package are suit for the sea transportation, steel and wooden plate is usual, if you need special package, Pls contact me for detail, we will meet your demands.
Delivery Time ?
For one 20GP container, the delivery time is about 15-25 days,
For 1-5 20GP containers, the delivery time is about 15-50 days.
For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.
Product Quality
1) we can send you the samples for your checking our quality.
2) If you have time ,we welcome your coming to visit our factory.
Scaffolding refers to the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support.Architecture of the generic term, refers to the construction site in exterior, interior, or higher storey height can't construction directly.Scaffolding compared with the general structure, the working conditions has the following characteristics: 1, by load variation;2, fasteners, belong to semi-rigid connection nodes and node rigid size is associated with fastener quality, installation quality, node performance there is a big variation;3, scaffolding structure and component of initial defects, such as initial bending of bar, rust, erection of dimension error, the eccentric load, etc.;4, and the wall connection, bigger binding variation on the scaffold.The above accumulation and statistical data, the study of the problems of the lack of system does not have independent probability analysis condition, so the structural resistance adjusting multiplied by the coefficient of less than 1 its value system with using the safety factor of the calibration.Therefore, the specification adopts the design method of essentially belongs to half probability, half experience.The structure of the scaffold to satisfy the provisions of this specification requirement is the basic conditions of design and calculation.
- Q:The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
- Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
- Q:Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
- The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
- Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
- Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
- concentration your interest on who's on the scaffold, how they react to the regularly occurring public shaming, and what the reader learns with regard to the character from examining the define of them on the scaffold.
- Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
- (1) main componentComponent for forming the main body of a scaffold. The vertical rod and the top rod are respectively provided with two kinds of specifications, and both sides of the rod are welded with a lower bowl buckle with a spacing of 600mm. If the vertical rod and the ejector rod are matched with each other for long use, the utility model can form an arbitrary height scaffold. Take a long pole, the joints should be staggered, the top layer and then leveling rod length two.
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
- Is there a bad song by Garth Brooks - no. I loved going to his concert in NYC central park. That had to be the best concert I ever attended. When he did The Thunder Rolls and had the sound effects of thunder to start the song it brought chills up my spine. Garth rocks!
- Q:Key points for safety of portal scaffolding
- 4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
- Q:Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
- Button bowl frame of various specifications and theoretical weight list: scaffolding company, steel pipe, scaffold engineering, scaffold accessories, Wuxi scaffolding, scaffolding rental, mobile scaffolding, scaffolding, scaffolding rental, Aluminum Alloy scaffolding, scaffolding, mobile scaffolding, stainless steel scaffolding;
- Q:What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Galvanized Steel Plank for Cuplock Scaffolding System
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 2000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords