• Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight System 1
  • Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight System 2
Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight

Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description




Custom SF63 Rectangle / Square

Column / Wall Construction


Custom SF63 Rectangle / Square Concrete Column System With Light Weight


Description:

Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight



The SF63 system is composed of formwork, props, connecting pins, etc. It is widely used in column/wall construction.


Competitive Advantage:

1. The allowable pressure from fresh concrete is 45KN/m2 with the thickness of 63mm.

2. Economic and fast connection with neat connecting pins.

The system is connected by cross-pins, the number of which shoulp;['p;d be according to the demand of construction. Two kinds of cross-pins are supported to meet the connection demand of templates and fillers. Only a hammer can make panels firmly connected together, other tools are not needed.

3. Light weight, fast turnover and easy transport.
4. Component with high standardization.
5. The maximal pouring dimension of column is 750x750mm.

Applications:

Custom SF63 Rectangle / Square Concrete Column Formwork With Light Weight


Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q: The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q: Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords