New building material formwork for concrete wall/ light weight concrete wall panels
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 120 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
New building material formwork for concrete wall/ light weight concrete wall panels
Saving your time, money and energy !!!
What is Details of our products plastic concrete formwork ?
Features:
1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,
where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork
is more cost effective.
2. Waterproof -- As the nature of plastic material. It's imputrescible and rustless,
especially suitable for underground and watery circumstance.
3. Interlocking Design -- No release agent needed, good effect of demolding.
4. Easy deassembly -- The template will be separated easily from concrete
5. Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.
6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability.
7. Recycable -- Waste scrap molding board could be recycled.
If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .
Any building drawings is OK, just send us your drawing, we can make the plastic formwork quantity for you.
And we warmly welcome friends from all over the world to visit our factories for business.
- Q: Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- The lower the density of the foam board is easier to deform.Crust foam can be changed to coextrusion foam. General cross-linking or blending halogenation and other methods to improve Vicat. Reduce traction override
- Q: I am a novice, do this product development, and now design a set of products, and now take the product to open the mold, it is not clear what kind of material template selection! Please advise experts who look
- Is the template based on your product requirements, can you talk about the requirements of each part of your product?
- Q: Why the floor is not plastic building materials square wood and template
- Is the plastic strong? The environment on the site you know, throw off how to do, have to find strong and durable.
- Q: I heard that there are building aluminum template and plastic template it? Which is better?
- Aluminum alloy template construction is convenient, high efficiency: aluminum alloy building template system assembly is simple, convenient, average weight 30KG / m2, completely assembled by the artificial, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer Easy to install), skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold workers only need to install wood workers 70-80%, and do not need skilled workers, just install Before the construction of the staff can be a simple training can be).
- Q: Plastic mold dynamic template, the size of the template
- Did not you understand what you mean? The dimensions of the mold are based on your mold design, the more product positioning, the greater the shape of the mold.
- Q: How does the concrete on the plastic template remove (already glued to the concrete)
- Water, washed with water, rubbing with things, spend time slowly removed
- Q: I heard that plastic construction template workers do not want to use, there is such a situation
- The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
- Q: Plastic building template where there is an urgent need to solve
- Plastic building template is an energy-saving and green products, is following the wood template, the combination of steel formwork, bamboo glued template, all the steel template after another new generation of products. Can completely replace the traditional steel formwork, wood template, square wood, energy saving and environmental protection, amortization cost is low.
- Q: The price of raw materials can say better, is the PVC material.
- Templates in accordance with the different prices of materials are also very different. The general plywood is 50-65 / sheet.
- Q: Will the plastic building template on the builders really do not use the price is how much price
- Over the past two years the domestic market has appeared several "plastic building template", many builders are also trying to use plastic building templates, we all recognize that plastic building template is to replace steel mold, wood mold, bamboo mold of the inevitable product, Is the future direction of the development of architectural templates. Now the country has six or seven plastic building template manufacturers. Production of plastic building templates are different materials, in order to help all the correct selection of builders, the market is now on the composition of several plastic building templates and performance for a rough analysis, to all the use of plastic building templates to build a wake up , To avoid blind selection and cause unnecessary losses.
Send your message to us
New building material formwork for concrete wall/ light weight concrete wall panels
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 120 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords