Timber Beam Formwork System
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meter/Meters m²
- Supply Capability:
- 6000 Meter/Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Timber-Beam Formwork
1.Introduction of Timber-Beam Formwork
H20 beam
High-grade raw materials;
High quality, low price;
Dimensional stability.
H20 Timber Beam
Wings:Spruce Wood(From Finland);Web:Cottonwood plywood;Glue:HENKEL Glue
2.Specifications of the Series of Formwork
Wood material:Spruce from Finland
Flange size: 80X 40mm
Web width: 30mm (3-layer OR multi-layer)
Weight/: 5.00kg-5.20kg/meter
Length avaible:1.25/2.45/2.65/2.9/3.3/3.6/3.9/4.9/5.9/6.6 Meter
Quality assure: Have been applied to all over the world
Surface finishing: Waterproof yellow painting or other color
Packing: Different length loaded differently
Glue:HENKEL
Price advantage: 20-30% cheaper than others based on same quality
Design ability: We can offer you a general proposal based on your structural drawings
3.Characteristics of the Series of Formwork:
Standardized production lines.
Professional loading.
Supply capability:3000Meter/day.
L max=6600MM.
Production lines
Professional loading
Finger jointing of the flange and web,the strength of timber beam is highly improved.
Max. shearing force failure load:40KN
Well treated to prevent from water penetration or erosion, so the service life is maximally
extended.
Normally, CNBM timber beam H20 can be used for 4 to 5 years,the exact using time would
depend on maintenance & storage.
Robust caps at the end of the girders protect against damages.
H20 timber beam with end protection
4.Project Application
Pearl Tower 14B,Doha,Qatar
Steel Frame Formwork
1.Introduction of Steel Frame Formwork
As the framework,it is adapted to the plywood with thickness of 18mm.High-precision production
line guarantees the perfect products.It can be used for wall,column and corewall.
2.Characteristics of Steel Frame Formwork
Few parts for fast forming.
Max.Concrete pressure:80KN/M2
Hot-dip galvanized steel frame
The thickness of plywood is 18MM & the panel is 14CM
Compatibility with Hunnebeck Manto system due to similar edge profile.
Flexible Panel arrangement and height extension.
3.System Details & Application of Steel Frame Formwork
Corner Details
4.Project Application of Steel Frame Formwork
Aluminum Formwork
1.Introduction of Aluminum Formwork
Whole aluminum formwork is a new technology for formwork,It is very light and the concrete
surface is more smooth than traditional method.All the material is recyclable.
2.Characteristics of Aluminum Formwork
Lighter weight but high bearing capacity.
Manual transportation can be achieved,greatly reduces the aggregate cost.
Perfect design,excellent produce and well welding make sure the flatness of concrete surface.
It is with the advantages of standard design,excellent applicability and interchangeable.
Simple,safe and fast.
No rust corrosion,easy maintenance,and high turnover rate.
The formwork series are a complete system with a full set of accessories,can be set up flexibly
according to project.
3.Details of Aluminum Formwork
4.Application of Aluminum Formwork
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Timber Beam Formwork System
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meter/Meters m²
- Supply Capability:
- 6000 Meter/Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords