• 6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513 System 1
  • 6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513 System 2
  • 6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513 System 3
6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513

6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
20 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: building, bridge, electricity plant

  • Max. Lifting Load: 6t

  • Max. Lifting Height: 120.8m

  • Span: 55m

  • Place of Origin:  China (Mainland)

  • Brand Name: CNBM

  • Model Number: Q5513

  • Certification: CE, ISO9001, GOST,CU-TR

  • Warranty: 12months

  • After-sales Service Provided: Engineers available to service machinery overseas

  • Color: Yellow, red, blue,etc.

 

Main Features

 

1) TC5513 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Specification Parameter

 

 

6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513

6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513

6T Tower Crane Manufacturer, QTZ80 Q5513 TC5513


Packaging & Shipping


All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 
 

 

Our Services
 

 1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q:what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
Q:What makes a crane so strong?
Cranes are built using a structural technique called a truss which is characterized by looking like a series of triangles connected together. That structure prevents the members from having to resist any bending loads. All of the truss members experience only tension and compression, no bending. That is an extremely efficient structure which is why they can be so strong without being monstrously heavy. Or if you prefer the short answer, engineers make the crane so strong.
Q:what does dog everything mean in crane lift lingo?
it means to stop the crane from doing anything, just sit still untill otherwise told to carry on
Q:Since now everyone will know what's coming when you get in the crane kick position, and the element of surprise is gone, has the crane kick become an extinct move? Do martial arts experts not like the Karate Kid for ruining the crane kick in the way magicians don't like other magicians who reveal their secrets?
Ummmm, assuming this is serious, the Crane Kick was basically made up for the movie. And it wasn't some magical technique, anyway. A guy standing on one leg really only has so many options available. That's why you never actually see anything like that in real competitions.
Q:I live in the upper stairs of this apartment with a huge light right next to the front door, and a bunch of Crane Flies kind of hover around it. So whenever we open the door, some of them come in, and it's a big problem. Especially to a someone like me who's deathly afraid of big bugs.So we want to buy the Raid spray, but we don't know if it would work. The Raid: Ant and Cockroach spray didn't work that well, but that's understandable.sooo anyways, has anyone tried the Flying Insect Raid on Crane flies?
Carburetor cleaner will destroy a roach instantly and costs less than Raid.
Q:don't its wheel provide the same amount of friction?
the capacity of a travelling crane relates to its resistance to tipping, and is dependent upon wheelbase, which can be extended by use of the outriggers, and counterweight (the big boxy thing at the back of the crane). Every lift requires a firm and stable platform which is what the outriggers provide. For every lift (weight) and reach (how far from the slew point), there is a limiting capacity factor. This is required to be posted within the operator's cab. The actual load lifted may be monitored by a load cell on a running rope (or other location), and through a computer control, limit the actual capacity of the crane.
Q:I've always been puzzled how cranes operate.Because as buildings get taller so do cranes but i don't know how they increase the height of the cranes.Can you help answer this please?
search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
Q:my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords