QTZ80(TC5513S) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(5513S) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q: If there are cranes by a small pond should there be fish?
- Cranes don't typically eat fish. They mostly eat insects, maybe an unlucky frog. If you're seeing herons or cormorants at this pond regularly, then that's your sign there's fish present. It doesn't take those birds too long to scope out an area for fish, and if there are not any there, the birds will move on. If they are there every day, grab your rod and reel and check it out.
- Q: Please try to give information on the questions bellow: .What the climate was in the Japanese Crane's habitat (high, lows, averages, precipitation) . Plants in the Japanese crane's habitat .2-3 major animals in its habitat .2-3 minor animals in its habitatTHANK YOU SO MUCH!!! .
- in the east Hokkaido, the north island of japan. some japanese crane in russia goes to north korea in winter, but cranes in hokkaido stay all through the year.
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: I'm thinking of making a senbazuru for by boyfriend as our first anniversary gift but I'm not sure if it's appropriate. I know its usually given to couples as a marriage gift, but yeah...does it seem too much?Btw a senbazuru is 1000 paper Cranes strung together.Thanks for the help!
- Wow..it's cool. People said that anyone who folds 1000 paper cranes will have eternal good luck. Your boyfriend is so lucky to have you.
- Q: dynamic force on crane when a load of 37k falls 1',2' 3'or 4'?
- Need more information. In general, the answer is that the dynamic load depends on how quickly the payload decelerates. The dynamic load will be the mass of the payload times the peak deceleration rate. In a strength calculation, do not forget to include the static weight component of the load. The deceleration depends on the elasticity of the cables supporting the load. If the crane has a flexible supporting structure, then that could also affect the result. (You didn't say whether the crane is the traveling overhead hoist type usually seen in a factory - which typically has a stiff support - or the cantilevered truss type seen on construction sites - where the support might have a little flexibility.)
- Q: Around how much would it be to rent a crane to put a jacuzzi in my backyard.
- Cost To Rent A Crane
- Q: I have three of these little pests hovering around in my tiny bathroom (my flatmate left the window open). I don't like to get close to them, and when they flutter near me I panic. I need an effective method of getting rid of them, that doesn't require me to get close or touch them - I really need to shower, so any advice is welcomed!Thanks, Ashley.
- A Daddy Long Legs is a spider. Crane flies are not related to spiders. We call crane flies leatherjackets even though that's the name for the larvae. My husband calls them mosquito hawks. If you don't have my cat, who considers them a delicacy and allows me to carry her around the house so she can catch them and eat them (and apparently floss her teeth with them), then the towel snap is quite effective.
- Q: A. Load capacityB. Fluid leaksC. Clearance for swing radiusD. Wire rope wear and sheavesE. All of the above must be inspected before operating a crane
- Load capacity is not required to inspect provided that the crane was inspected by third party and certified to the loads
- Q: Calculate the tower crane gantry crane
- It includes electric hoist, big car running mechanism, bridge frame, support leg, electrical equipment and so on. Applicable to station, wharf, warehouse, freight yard, construction site, cement product yard, factory, hydropower station and other outdoor work place, also suitable for indoor workshop work
- Q: Four for crane, two for insurance, two for insurance. What does that mean?
- Refers to the air switch and the electric leakage protector in the electric tray.
Send your message to us
QTZ80(TC5513S) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords