• Tower Crane TC6024 Max. lifting weight 10T System 1
  • Tower Crane TC6024 Max. lifting weight 10T System 2
  • Tower Crane TC6024 Max. lifting weight 10T System 3
  • Tower Crane TC6024 Max. lifting weight 10T System 4
  • Tower Crane TC6024 Max. lifting weight 10T System 5
  • Tower Crane TC6024 Max. lifting weight 10T System 6
Tower Crane TC6024 Max. lifting weight 10T

Tower Crane TC6024 Max. lifting weight 10T

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 10T

Span: 60m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC6024         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications


● Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.


● Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.





FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 


To Lead The Revoluation of International Trade

Q: My kid wants to pet a crane fly because it's cool but I don't want to keep it around as a pet. I'm not a fan of crane fly. How should I tell him no? Also, I'd like to explain to him besides the fact that it disgusts me: I don't like insects.
Maybe this is a good opportunity to spend some education time with your child, and look up crane flies on the Internet. They do not eat, and they have short lifespans, so they really would make lousy pets, but it might be a more positive way to convince him of this if you spend the time with him researching the animal together so that he comes to understand these facts himself. It is very good that you are leaving your personal dislike out of it in your explanation, good for you!
Q: who can tell me tower crane details?
1. Accurate positioning Kinematic limit, High-repetition-accuracy torque,weight limiter ; 2. Unique, and reliable car off-axis device and Trolley Anti broken rope Safety Device; 3.Independent of side driver's cab,its Vision is good,with a large space in the tower crane driver's cab,Using linkage console,Configuration ottoman, convenience, and comfort; 4. Machine appearance as an international pop style, beautiful and generous 5. Long boom, operating a large space, a rigid double-bar suspension, light weight, cross-section is small, air resistance is small, the leading domestic;
Q: in the short story open boat by stephen crane how does he define Fate?
Without doing your work for you, Crane is a naturalist. They believe nature works at random, and is completely unsympathetic to man's plight in the process. Hence, the oiler dies. He was probably the strongest one in the boat. So, how does that translate into the concept of fate?
Q: Cranes nowadays are MASSIVE! but something that has been bugging me for ages is how do they get the massive crane bit at the top down once they have finished constructing the skyscraper/building?
A okorder /
Q: How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q: inventor of junk yard electromagnetic crane?
Who Invented The Electromagnet
Q: I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
Seneca Crane was the previous Head Gamemaker. He was the one who didn't think past Katniss and Peeta eating the berries. President Snow makes it evident that he was executed for his mistake with the games. I still don't understand why she did it, or why they were so shocked. It probably just offened them, or maybe it was something of a threat, that she'd meant to get him killed. Who knows?
Q: why was the japanese crane hunted for its plumage in the 20th century?
At okorder /
Q: I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
Get ready for the new tower.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords