• TOWER CRANE TC5010AS System 1
  • TOWER CRANE TC5010AS System 2
  • TOWER CRANE TC5010AS System 3
  • TOWER CRANE TC5010AS System 4
TOWER CRANE TC5010AS

TOWER CRANE TC5010AS

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:What time period would you consider that Stephen Crane wrote in? I have no idea. By time period, I mean like the kind of writing from those times. Ex: Renaissance Period.
Crane was from the late Victorian era, timewise. His prose writing was American realism or naturalism, but his poetry was more modernistic. The Edwardian era began just after his death in 1900. Although his most famous work was The Red Badge of Courage, he was not even born during the Civil War.
Q:how to make a magnetic crane on cheap price?
The whole crane or just the lifting device? Not easy to be cheap in either case - the crane because of safety concerns and the lifting head because it requires a lot of now high priced copper wire, well insulated, and a hefty electrical source with long cables to get the power to the head. Best (probably) to buy used if you want to save money.
Q:Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:why was the japanese crane hunted for its plumage in the 20th century?
At okorder /
Q:for my homework : the question was explain how a skyscraper crane uses physics moments but no where can i find out the answer and dont want a detention ekkk x
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q:Tower crane driver simulation exam which website?
The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
Its been carried out till now, many early vehicles have been steam powered. genuine it may burn renewable fuels alongside with trees, inspite of the undeniable fact that it has to hold those fuels with them (check out a steam loco - extensive soft or coal that's extra compact capability than trees) draw back may be the load of the part of get the overall performance needed, the smoke (and then smog), and the capability needed totransport the boiler, water tank and gasoline till now you even thinkabout the burden it is going to hold. extra suitable for busses could be to pehaps generate electrical energy and grant that to the bus - and thats been invented too -a tram! reward are that the gasoline doesnt could desire to be carried with the vehicle (extra useful - lighter), brakes canbe used to generate electrical energy, cleanser inthe cities, and the turbines could have scrubbers on the chimneys to take out the harmfull gasses
Q:This poor little guy has been out on my balcony where I smoke my cigarettes for two days now. One wing is badly mangled and he can't fly away, I thought to just let him work it out yesterday in hopes of him healing on his own somewhere, but today he was climbing on my leg as if asking for help and I feel horrible for him now...he's suffering, he hasn't gone far in at least 24 hours I feel I should feed him and give him water until he heals...what do crane flies even eat?? Any advise aside of killing him and putting him out of his misery would be great!!
Take him to a wildlife reserve! He has a chance of life! Or a 24 hour emergency vets office would be good. You could call a vet to come to your house. It might be a little pricey, but the animal would thank you for it. If he is suffering too badly, a vet will make the decision to euthanize him. If you have any children at your house, do not allow them to see it. It does not make a child happy to see a bird in that condition. I would call your local vets office now.
Q:All types of jack up cranes. How is the maximum lifting torque converted?
Tower crane lifting torque = crane maximum lifting weight * maximum operating range; for example: the maximum lifting weight is 2T*, the maximum operating range of 50 meters =1000KN.m.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords