Tower Crane of Chang Li Model Number TC6016
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC6016 Description
Feature: Tower Crane
Condition: New
Application: All kinds of costruction
Rated Loading Capacity: 4T
Rated Lifting Moment:500/630/800/1000/1200KN.m
Max. Lifting Load: 4T
Max. Lifting Height: 150m
Span: 42M
Place of Origin: Henan, China (Mainland)
Brand Name: Yu Jie
Model Number: TC6016
Certification: ISO,CE,BV,SGS
Warranty: 12 months
After-sales Service Provided: Engineers available to service machinery overseas
Tip Load: 0.8
Trolley travel speed: 38/25m/min
Slewing speed: 0.6r/min
Jacking up: 0.4m/min
Powed: 380V/50HZ
Lifting character: 2/4 Fall
TC6016 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
TC6016 Specification
TC6016 Pictures
TC6016 FAQ
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
- Q: How should I go about stringing paper Cranes together??I alreadly know how to make them, its just that I have no clue how to put them together
- You poke a hole in them and string them....
- Q: What windproof devices should be set up for crane work?
- Safety protection device and function of crane1. overload limiterIt is a safety guard for cranes to prevent overload, also called a weight limiter. The safety function of the utility model is that when the crane load exceeds the rated value, the lifting action is stopped, so as to avoid overloading. Overload limiters are widely used in bridge type cranes and elevators. Some boom type cranes (such as tower cranes and gantry cranes) use the overload limiter and the torque limiter together. Overload limiter has mechanical, electronic and many types.(1): mechanical drive ram through a lever and a spring cam, etc., when overloaded, hit the switch control rod and the lifting action phase, cut off the power source of hoisting mechanism, control the lifting mechanism to suspend operations.(2) electronic: composed of a sensor, an operational amplifier, to control the actuator and load indicator, display, control and alarm and other security functions in a body. When the crane is loaded, the sensor on the load bearing component is deformed, and the load weight is converted into an electric signal, and the value of the load is indicated by operation amplification. When the load exceeds the rated load, the power source of the lifting mechanism is cut off so that the lifting action of the lifting mechanism can not be realized.
- Q: Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q: I was told that this was taking place, so i would like to fax the info to the proper local
- Every city and every state has their own set of rules, where there are any. Also, the federal government has rules also. and the contractor has a set of rules also. And if you are in a union, they have a set too. So it depends on the country, state, city you are in. Do a search for Philadelphia Crane operator rules on google, for example. But i doubt any of them will say dogs are allowed. However, probably none of them will mention a dog at all, the assumption being that common sense will tell any competent operator that dogs and cranes do not mix. And I doubt any of them say pet snakes not allowed either. .
- Q: how to draw a crane hook on auto cad?
- Measure a crane hook then draw it. Even better, visit a manufacturer's web site and see if you can download one of their drawings for a hook.
- Q: open boat by stephen crane
- The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
- Q: What is a "crawler crane" and what kinds of jobs is it good for?
- *A crawler is a crane mounted on an undercarriage with a set of tracks (also called crawlers)that provide for the stability and mobility of the crane. Crawler cranes have both advantages and disadvantages depending on their intended use. The main advantage of a crawler is that they can move on site and perform lifts with very little set-up, as the crane is stable on its tracks with no outriggers. In addition, a crawler crane is capable of traveling with a load. The main disadvantage of a crawler crane is that they are very heavy, and cannot easily be moved from one job site to the next without significant expense. Typically, a large crawler must be disassembled and moved by trucks, rail cars or ships to be transported to its next location. Crawler cranes range in lifting capacity from about 40 US tons to 3500 US tons.
- Q: I've read significance and accordance online. But i can't find a source for defiance, I used epub bud for the other two books but this book isn't on the website. Is there anyway I can read defiance by Shelly Crane online for free?
- did you ever get to read this book
- Q: .......rated by the ________ weight it will lift at a ________ radius and ________ boom length.A. Maximum; minimum; maximumB. Minimum; maximum; maximumC. Maximum; minimum; minimum
- It is Maximum weight, Minimum Radius, Minimum boom length
Send your message to us
Tower Crane of Chang Li Model Number TC6016
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords