Tower Crane TC5613 Construction Equioment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5613 Description:
1.CMAX Tower Crane TC5613 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5613 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5613 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5613 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5613 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5613 Parameter:
Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 46
Max height with attachment (m) 150(200)
Working range can be adjusted (m) 44、50、56
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.3
Tower Crane TC5613 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5613 Diagram:
Tower Crane TC5613 Technical Sheet:
Tower Crane TC5613 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5613 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56meter, and the last two letter “13” means the tip load is :1.3 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
- You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
- Q:The truck has a Comprehensive Motor insurance cover. There is no exclusion in the policy in respect of tools of trade.
- read your insurance policy.
- Q:What is the minimum radius of a tower crane?
- Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical. The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,
- Q:method how to assemble tower crane?
- Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
- Q:When the tower crane foundation is found, what should be discontinued?
- The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
- Q:Would David have made a better babysitter than a crane driver?
- Well, apparently he was a crap crane driver...
- Q:A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
- It really depends on the terrain or the platform where this crane will stand.. If it is in a muddy or sandy terrain, then they may opt to use a chain tire. Cranes, dont merely rely on the tires. Cranes use outriggers. These are the extending arm of the crane. This hydraulically operated mechanism goes out of the cranes body, extends and extablished itself at four corners and sits at the ground to provide leverage for the cranes. This will prevent the crane to overturn when it is doing the operation.
- Q:They;re ENORMOUS!!! Do they take them apart or something?
- Pop bottle rockets make them all fly away really fast. If they fly over you watch out for the poop!
- Q:I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
- There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
- Q:im doing and essay and i need help on what motivated him to write this poem. im in 9th grade
- Well, the poem talks about war and its aftermath. and its horrors. Look into Stephen Crane's life. Was he affected by war? Did anyone in his family go to war? Did he go to war? Did he see the war. Maybe he was in the war and is talking to someone who felt the affects of it.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5613 Construction Equioment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords