Tower Crane in India Yongli for Buiding Manufacturer TC5008
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 120 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC5008 Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 1-4T
Rated Lifting Moment: 200MT Max. Lifting Load: 4T
Max. Lifting Height: 29M Span: 50M
Model Number: TC5008
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
TC5008 Features
1. With automatic welding robot for tower crane structures.
2. Export to more than 20 countries with CE/ISO Certificate.
3. Stationary or Fixed or Inner Climbing tower crane
4. Impeller blasting or rust protection paint
5. Advanced painting process and excellent color
6. New designed mast, can be used to Internal and external climbing
7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor
TC5008 Specification
TC5008 Pictures
TC5008 FAQ
My dear friends, If you need any tower cranes, please tell us the below basic parameters:
1. Building height or tower crane working height.
2. Max load capacity and tip load capacity.
3. Span or jib length
4. Other Special requirements
Welcome to contact us! Believe will be your best choice!
- Q: Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
- Kung Fu Crane Stance
- Q: Hi, considering joining a fujian white crane kung fu club, just looking for information on the internet. need videos and photos and descriptions about it. any links? thanks!
- white okorder /
- Q: What is the difference between lifting height of tower crane and independent height?
- It is not the kind of independent highly rigid or flexible attachment function when the tower reached the maximum height, lifting height of the tower is at the maximum height and the minimum amplitude in hook, hook support face datum allows the maximum vertical distance of tower crane.
- Q: Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
- Ahh.. I love it. Ian Dury's words came to mind. Noel Coward was a charmer. As a writer he was drama. Velvet, jackets and pyjamas, The gay divorce and other dramas. There ain't half been some clever bastards (Lucky bleeders, lucky bleeders) There ain't half been some clever bas-tards. Van Gough did some eyeball pleasers. He must have been a pencil squeezer. He didn't do the Mona Lisa, That was an Italian geezer. There ain't half been some clever bastards (Lucky bleeders, lucky bleeders) There ain't half been some clever bas-tards. Einstein can't be classed as witless. He claimed atoms were the littlest. When you did a bit of splittemness, Frighten everybody shitless. There ain't half been some clever bastards. Probably got help from their mum (who had help from her mum). There ain't half been some clever bastards. Now that we've had some, let's hope that there's lots more to come.
- Q: Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
- I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
- Q: What are the working mechanisms and safety devices of tower cranes?
- About the structure: Tower cranes are all metal structures, so far there is no wood. About institutions: tower crane working mechanisms are: winding lifting mechanism; luffing mechanism; slewing mechanism; cart moving mechanism; lifting mechanism.
- Q: how do cranes get assembled ? on building sites?
- By people.
- Q: Protected cranes are nesting in pine trees with possible disease carrying bird droppings covering drive way and street where neighborhood children play. I've called several local organizations only to be told there is nothing I can do since they are protected by law. These birds return every year and stay for about 4 months - each year gets worse with droppings and stench. Daily cleaning is required but that still does not keep the areas around them clean.
- Give the U.S. Fish and Wildlife Service a call I'm sure they will help in some way.
- Q: How to improve the stability of tower crane
- The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
- Q: When should a crane be load tested?
- if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Send your message to us
Tower Crane in India Yongli for Buiding Manufacturer TC5008
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 120 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords