• TC 6024A tower crane System 1
  • TC 6024A tower crane System 2
  • TC 6024A tower crane System 3
  • TC 6024A tower crane System 4
TC 6024A tower crane

TC 6024A tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC6024A tower crane is hoisting and conveying machinery which is designed  by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Q:in the title. any books that talk about the physics in a tower crane? or any crane in general? or a similar machine to a crane?
Hi, Well, this is an interesting topic about physics and requires to have a basic knowledge, correct? So here we have some books: - Chopra, K. A. Dynamics of Structures: theory and applications to earthquake engineering. - Bostelman, R., et al. “Toward Next-generation Construction Machine,” Proceeding of American Nuclear Society 9th International Topical Meeting on Robotics and Remote Systems. - Gore, Bryson. Trucks, Tractors, And Cranes. - Grote Antonsson, editors. Handbook of Mechanical Engineering. - Seidel, Michael. Tensile Surface Structures. B-) FL ------------- You cannot teach a man anything; you can only help him discover it in himself.” (Galileo Galilei)
Q:analysis of jib crane?
I would suggest that you delete this question and submit a new question with enough details for someone to give you an answer. This is not a question I can give you much help on
Q:hi, i was just looking for a guide to change a full stock to a crane stock on an m4, (its wired to the back)i dont actually have the gun yet im buying it from a freind, so i havnt had a chance to look at it but the the gg gr16-r4i was wondering if its just a m4 with a stock that is wired to the back, how there is the two long screws that run from the back of the buffer tube to the body, then you just switch it out for a crane stock...anyway anything would be great, thanks
you need a crane stock and a buffer tube for it. the full stock does not use a buffer tube. you simply guide the wires through the buffer tube (once you attach it to the back) and into the stock. then just pu the stock on and put the batteries in and viola! crane stock!
Q:Please help. I need real answers.
About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
Q:Is stature of the crane a Japanese, Chinese, or Okinawan form?
Found in kata from all 3 sources okinawan japanese and chinese .GANAKAKU KATA in shotokan CHINTO in okinawan kata and in FUKIEN CRANE STYLE for chinese. GANAKAKU means crane on a rock.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:MP: Do you do any origami?MP: How bored are you at the moment?MP: What do you think of this She Wolf song by Shakira?I can't really form an opinion on it.
How can I make a paper crane come to life and fly me away to another world? Wish on a paper mache star? MP: Do you do any origami? Randomly yes I do. MP: How bored are you at the moment? Mmmm, I'm a work so yes. MP: What do you think of this She Wolf song by Shakira? I first heard it while viewing the video. I think I probably looked like a deer caught in the headlights. Conundrum.
Q:Who was the guy called the Headless Horseman in the story of Ichabod Crane?
A Lib
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords