• Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010 System 1
  • Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010 System 2
  • Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010 System 3
Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

Tower Crane in India Yongli for Buiding Manufacturer Hot Sale TC5010

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC5010 Description

Feature: Tower Crane                      Condition: New 

Application: urban construction        Rated Loading Capacity: 1-5T 

Rated Lifting Moment: 500KN.M       Max. Lifting Load: 5T 

Max. Lifting Height: 140M                Span: 50M 

Model Number:  TC5010

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

TC5010 Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

TC5010 Specification

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

TC5010  Pictures 

 

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010

Tower Crane in India Yongli  for Buiding Manufacturer  Hot Sale TC5010



TC5010  FAQ

 My dear friends, If you need any tower cranes, please tell us the below basic parameters:

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements 

Welcome to contact us! Believe will be your best choice!


 

 

 

 


Q: If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q: My fiance and I would like to make 1,000 paper cranes for our wedding next year in May. We are looking for a good type of paper to use for this. We are not too particular on the color of the cranes, though we like blue or gold. Does anyone have any feedback on the sort of paper I can get for this project? I know there is origami paper I can buy, but I was wondering if that is the only option I have to choose from. Thanks in advance! :)
I okorder Hope this helps!
Q: Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
Chuck Norris should be a judge.......why? cause' he's Chuck (drum roll).............NORRIS!
Q: The story I'm writing that has Frank Crane in it is here. Is there a better name I could be using for the protagonist?
I agree with the first poster that you are doing something very wrong. Rather than worrying about the name you may want to reconsider the gender.
Q: from the legend of sleepy hollow, his background, characater, personality, life etc.
Howdy okorder ........whatever you like to use. Search engines are the whole key to locating information on most anything you want information on. Legend of Sleepy Hollow is of course what he is most famous for. Good luck
Q: Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q: when a skyscraper is done being built, how does the crane come down?
Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Q: i need the story cranes by hwang sun won and translated by peter h. lee and i cant find it on google. help i need the story for my essay
EEK! I just did a search under Hwang Sun Won. It appears that Cranes is a series of short stories. Is that what you meant? If it is one particular short story called Cranes, I can't find it. I would suggest you go to your teacher/professor and ask where to obtain a copy. If you can't ask your teacher, run, do not walk! to your nearest library and throw yourself on the mercy of the librarians! Another search option for you is to look for books by Peter H. Lee, specifically the ones he has edited. He has written several anthologies. Good luck!
Q: A site would be nice...
For themes, I wrote Fast Rode the Knight, written by Stephen Crane, is a short poem about a knight going into battle, and his forgotten horse. Some themes in this poem are love and devotion, battles in war, the passion that drives the soldiers, or knights, into it, the forgotten aftermath of the battles, and what has to be left behind for such a battle to be fought. The passion of the knight can be found in the lines Ever waving an eager sword/’To save my lady!’. The knight rides at a furious pace, driven by love and a blinding devotion to his love, or perhaps his Ruling Lady. thats just like the beginning, hope it can help you :D It's not nearly finished, but hope it is okay all the same :)
Q: crane signals?
they are out there somewhere, and everywhere I have been they are the same

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords