• Tower Crane TC6520 Max. working range 65m, System 1
  • Tower Crane TC6520 Max. working range 65m, System 2
  • Tower Crane TC6520 Max. working range 65m, System 3
  • Tower Crane TC6520 Max. working range 65m, System 4
  • Tower Crane TC6520 Max. working range 65m, System 5
  • Tower Crane TC6520 Max. working range 65m, System 6
Tower Crane TC6520 Max. working range 65m,

Tower Crane TC6520 Max. working range 65m,

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 10T

Span: 65m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC6520         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications


● Max. working range 65m, tip lifting weight 2.0T and Max. lifting weight 10T.


● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.



FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 


To Lead The Revoluation of International Trade

Q: The war is during 1899, and it's not the Spanish-American war.This isn't assignment, I'm just curious to know.
Sounds like War to me According to the black and bare lands, with women and babies weeping , etc. A person in the midst of this upheaval..the only one it seems Evidentely was ask milions of questions of why Because he was the only one who asked Why? He did not know the answer but he was the only one who cared..to me this is the meaning of the poem Stephen Crane wrote some brain teasing material..Read In the Desert
Q: How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q: What is a "crawler crane" and what kinds of jobs is it good for?
*A crawler is a crane mounted on an undercarriage with a set of tracks (also called crawlers)that provide for the stability and mobility of the crane. Crawler cranes have both advantages and disadvantages depending on their intended use. The main advantage of a crawler is that they can move on site and perform lifts with very little set-up, as the crane is stable on its tracks with no outriggers. In addition, a crawler crane is capable of traveling with a load. The main disadvantage of a crawler crane is that they are very heavy, and cannot easily be moved from one job site to the next without significant expense. Typically, a large crawler must be disassembled and moved by trucks, rail cars or ships to be transported to its next location. Crawler cranes range in lifting capacity from about 40 US tons to 3500 US tons.
Q: Has anyone ever folded 1000 paper cranes? If so did your wish come true? If it did come true what did you wish for? :) Thanks so much!
I know of someone who did. They did it as a fundraiser for a village school. They folded the cranes while working on the project, though, so I guess the lesson there is that you can make your own luck. The cranes look beautiful, though!
Q: what is the proper way to fold a paper crane?
Well, okorder /
Q: Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
actually okorder
Q: Which is the main basis for the disassembly and assembly process planning of tower cranes?
12 installation process;13 safety device debugging;14 major hazard installations and safety technical measures;15 emergency plan.2.0.12 tower crane disassembly special program should include the following content:1 project overview;2 plane and elevation of tower crane position;3 disassembly order;Weight and suspension position of 4 parts;5 disassembly type, performance and layout of auxiliary equipment;6 power settings;7 construction personnel allocation;8 rigging and special tools;9 major hazard installations and safety technical measures;10 emergency plan.
Q: Military Action movie with bunch of cranes at the end?
Cranes like construction equipment or Cranes like the birds?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords