TC6520(QTZ160) New Second Hand Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our TC6520(QTZ160) New Second Hand Tower Crane:
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our TC6520(QTZ160) New Second Hand Tower Crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our TC6520(QTZ160) New Second Hand Tower Crane:
Item | Parameter | ||||
Independent height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 55/60/65 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 10 | ||||
Tip load @ 65m(t) | 2 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250M1-6-45KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YZPBE132S-4-5.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YTW112M-4-5.5KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 21.3 | ||||
Mast section size(L×W×H)mm | 2000×2000×3000 | ||||
Working temperature | -40-+60°C | ||||
Max working wind(m/s) | 20 | ||||
Total power(KW) | 63 | ||||
Rated working voltage & current | 380V/121A | ||||
FAQ TC6520(QTZ160) New Second Hand Tower Crane;
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: Please, if their is a site that shows how to build a crane, provide a link. btw: i do not want to buy some sort of crane building kit.Thanks
- Do you need to build it so it can pick stuff up, cause thats gonna require, magnets and alot of other stuff, that I don't feel like talking about, bye:(
- Q: Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q: need a 5 ton jib crane design with drawing please help, boom 12ft hub 16ft?
- Hello, okorder /
- Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
- Large okorder .
- Q: How many motors does the ZOOMLION TC6013A-6 tower crane use?
- Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
- Q: What is the safe distance of a tower crane to the surrounding buildings?
- The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
- Q: across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
- I okorder you may find an article mate
- Q: I have found crane fly larvae on my kitchen floor in the middle of the night. Were are they coming from? How do I get rid of them?
- probably not larva of crane fly...they live in the soil outside. Describe or post a pic what you have
- Q: Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
- Its simple man, The company produces the concrete blocks called as hollow blocks also, they are lifted up using man power or lifts or cranes, dont know what was difficult to you in understanding that.
- Q: I know it is the last thing in the movie but what chapter does Crane's death occur? THANK YOU
- It's not metion in the hunger games, but in Catching Fire President Snows metions it to katniss. Then katniss does her presentation to the gamemakers, where she takes a dummy hangs hims and writes seneca crane in it.
Send your message to us
TC6520(QTZ160) New Second Hand Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords