Tower Crane 10 Ton Mechanism TC6016 QTZ100
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6016(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6016
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 1.6 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-4KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight(t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 60 | |||||||
Power supply requirement (KVA) | 190KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
380V×95%=361V 210A | ||||||||
Rated working voltage & current | 380V 116A | |||||||
Loading diagram:
60m jib length:
R | 2.5-22.4 | 30 | 40 | 50 | 60 | ||
a=2 (kg) | 5000 | 3646 | 2630 | 2014 | 1600 | ||
R | 2.5-11.245 | 20 | 30 | 40 | 50 | 60 | |
a=4 (kg) | 10000 | 5564 | 3573 | 2560 | 1944 | 1530 | |
54m jib length:
R | 2.5-24.55 | 30 | 40 | 50 | 54 | |
a=2 (kg) | 5000 | 4028 | 2919 | 2246 | 2046 | |
2.5-12.36 | 20 | 30 | 40 | 50 | 54 | |
a=4 (kg) | 10000 | 6130 | 3958 | 2849 | 2176 | 1976 |
48m jib length:
R | 2.5-25.69 | 30 | 40 | 48 | |
a=2 (kg) | 5000 | 4232 | 3073 | 2488 | |
2.5-12.96 | 20 | 30 | 40 | 48 | |
a=4 (kg) | 10000 | 6431 | 4162 | 3003 | 2418 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- www.okorder /
- Q: Describe how a bottleneck event reduces genetic diversity in a population, and specifically how this has affected the current population of whooping cranes in the U.S
- Well, a bottleneck reduces the number of organisms in a population or species down to a much smaller number than previously existed. In the case of the whooping crane, the species underwent a bottlenck event (although what it is I'm not sure), leaving us with less than 12 individual birds. The more widely accepted number of 6-8 birds has given rise to the several hundred whooping cranes alive today. Since only half a dozen sets of genes were used to create the several hundred, there is not much genetic variability.
- Q: When the tower crane foundation is found, what should be discontinued?
- The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
- Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- The cranes hook to the side of the building and climb the steel frame as it is being built. The crane can only reach a few stories so it has to climb each story's steel frame as it is finished.
- Q: What i am seeing is that people are using manual digging and buckets and manually cutting through steel!If they use cranes, it would be alot faster to get to those buried. I dont belive it is unsafe, if they are meticulous.
- It's not just a matter of being meticulous. You would have to know the structure of the pile of debris to be safe.
- Q: my father has his forklift and crane license. he needs to know how long they're vaild for
- should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
- Q: Grade 4 build a working crane Help!?
- Simple crane? Get a spool, maybe one from sewing thread. Attach it to a small base so that it can rotate freely. Put a pencil through the middle tight enough so that when the pencil rotates the spool rotates. Glue a tab on the end of the pencil at a right angle to the pencil so you have a handle. Attach string to the spool and then maybe a ruler or stick to a base lined up with the spool like a crane. Put a couple of eye hooks on the stick and feed the string through so it hangs down at the end of the stick, like a crane cable. At the end of the string put a springy clothspin so that when you pull the string the clothspin opens and closes. Now you can lift and lower the clothspin by rotating the spool with the pencil. Pulling on the string opens the pin to pick up things.
- Q: Does tower crane belong to special equipment?
- Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
- Q: What is the allowable range of vertical deviation for tower cranes?
- The verticality deviation range of ZOOMLION tower crane is allowed within 4/1000.
- Q: Which one is a better investment? I can get both for 200dollars
- Hi JAY ... Neither is a large investment compared to the time and work using them involves. Lifting an engine requires a lot of work getting stuff disconnected and , even worse, reconnected when put back. Of the two, I believe the crane would more useful. When considering such projects, you should take into account all your work and time the project will take. Whatever, I wish you the best.
Send your message to us
Tower Crane 10 Ton Mechanism TC6016 QTZ100
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords