• Tower Crane TC5516 type new distributor find System 1
  • Tower Crane TC5516 type new distributor find System 2
  • Tower Crane TC5516 type new distributor find System 3
  • Tower Crane TC5516 type new distributor find System 4
  • Tower Crane TC5516 type new distributor find System 5
  • Tower Crane TC5516 type new distributor find System 6
Tower Crane TC5516 type new distributor find

Tower Crane TC5516 type new distributor find

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 55m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC5516         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications


● Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.


● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability.


● Reduce future maintenance cost.




FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 


To Lead The Revoluation of International Trade

Q:I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q:My relatives and their kids are coming the 28th for our Christmas does any body know where I can get a Brio Crane for a 3 year old? most web sites I checked say sold out. Just wondering.
Hi okorder . Please visit it and it will satisfy your needs. Best regards, Soma
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
Article fifth of the rules for periodical inspection of crane machinery promulgated by the aqsiq:The periodic inspection period for lifting machines is as follows:(1) tower cranes, elevators and mobile cranes are 1 times a year; among them, the type of container type gantry crane is 1 times every 2 years.
Q:It`s like a big box filled with toys and u insert a coin and then u have 2 handle the small crane to pick up a toy...
There is one version called the Grab-O-Matic, and it is on sale at www.LeapsandBounds for $20.95, usually $34.95.
Q:Can anyone give me a summary of The Veteran by Stephen Crane?
A Civil War veteran, years after the war, admits to a group of men that he was frightened in battle; this, in gtresence of his grandson. The boy is visibly shaken by his grandfather's admission. this in the presecnce
Q:I looking for information on the surname Crane.?
See okorder /
Q:What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q:You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
The cranes are built in the elevator shafts and moved up as needed during work progress.
Q:how do they get cranes on top of building sites?
One way is another crane, although I think you are talking about the ones for really tall buildings. In those cases, they use a crane (self-hoisting tower crane) that is able to raise or hoist itself up as construction continues. For example, it will be working on the 10th floor, and then it will climb the recently placed girders to the 11th floor, and so and so forth. Sometimes the crane is disassembled at the top... other times, it is kept there to aid in window washing.
Q:This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords