Tower Crane provide stepless speed regulation
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC6024 Description
Feature: Tower Crane
Condition: New
Application: Construction
Max.Lifting Load: 10T
Max Tip Load:2.4T
Independent Height:50.5M
Max Lifting Height: 200M
Span: 60m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC6024
Characteristic of Tower Crane TC6024
1) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
3)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
4) Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
5) Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.
6) Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.
Tower Crane TC6024 Specifiction
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 2.4 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YZPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-5.5KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight (t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 63 | |||||||
Power supply requirement (KVA) | 230KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
Startup voltage & current | 380V×95%=361V 219A | |||||||
Rated working voltage & current | 380V 121A |
Images Tower Crane TC6024
FAQ of Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- www.okorder /
- Q: Synopsis for the poem Lost Dances Of Cranes?
- If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
- Q: have you noticed that there has been an exceptionaly high volume of cranes falling over in the U.S.A. this year? 2 cranes went down this week, one in Texas killing a man. seems like there has alot of this lately, what the hell is going on with the cranes? ever night i turn on the news its like a deadly crane accident took place today . thanks.
- My brother is a crane driver, and its scary when you hear about these accidents. Last week a man was killed in a quarry when the crane he was in touched an electric wire
- Q: How much height should tower crane work at M?
- Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
- Q: What should be included in the disassembly plan of the tower crane?
- - 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
- Q: the numbers i found on it are ay7648 ssh-310-nc
- Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
- Q: What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
- Should be the same series, but lifting weights are not the same
- Q: Has anyone made 1000 origami cranes and made a wish? Just wondering
- Yes. Also, after the atomic bombs were dropped on Japan, a girl with radiation poisoning tried it, but died after making six hundred and odd cranes. Make of that what you will.
- Q: How do they erect HUGE cranes without a crane?
- They use Hydraulics. I don't know if you have any understanding of Fluid power but a hydraulics system can lift up to 400% of its weight multiplyed by its density. There are other factors to consider such as cylinder size, flow, and pressure but these are usualy constants. For example: If the hydraulic fluid used weighs 5 lbs. per gallon and its density is .9 gram per cubic centimeter then 1 gallon of this fluid could lift 53.1441 lbs. A jack system is hydraulic
- Q: i want to know about the origami cranes
- Origami okorder
Send your message to us
Tower Crane provide stepless speed regulation
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords