• TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 1
  • TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 2
  • TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 3
  • TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 4
  • TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 5
  • TC6016(QTZ100) Building Construction Material Tower Crane Purchase System 6
TC6016(QTZ100) Building Construction Material Tower Crane Purchase

TC6016(QTZ100) Building Construction Material Tower Crane Purchase

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC6016(QTZ100) Building Construction Material Tower Crane Purchase:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC6016(QTZ100) Building Construction Material Tower Crane Purchase:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC6016(QTZ100) Building Construction Material Tower Crane Purchase:

 

ItemParameter
Free standing height (m)50.5
Max height with attachment (m)200
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 60m(t)1.6
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-4KW×2
Climbing speed(m/min)0.5
Counterweight(t)48m jib 54m jib60m jib
15.4517.8518.9
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)60
Rated working voltage & current380V/116A

TC6016(QTZ100) Building Construction Material Tower Crane PurchaseTC6016(QTZ100) Building Construction Material Tower Crane PurchaseTC6016(QTZ100) Building Construction Material Tower Crane Purchase

TC6016(QTZ100) Building Construction Material Tower Crane Purchase

TC6016(QTZ100) Building Construction Material Tower Crane Purchase


TC6016(QTZ100) Building Construction Material Tower Crane Purchase

FAQ TC6016(QTZ100) Building Construction Material Tower Crane Purchase;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: i am having trouble finding out 2 points that Stephen Crane makes about courage in this story. can anyone please help me? =(
The okorder /... Author Stephen Crane describes this loss of individuality as a key part of the war machine. This sense of selflessness can be a good thing – like when feeling part of the human race will make you jump under a subway to save another man, or the way you care more about your team winning the game than you do about scoring that last point yourself. But it can also be dangerous, as The Red Badge of Courage reminds us. Cogs in machines usually don’t think, and no thinking means no judgment or discretion as to whether an act is right or wrong.
Q: Please help me on this question, I can't seem to find it anywhere on the internet! :(
No animals depend on Siberian crane but they are a source of food to carnivores in the wild.They are usually secondary source because there are mroe source of food that carnivores could eat.SO if they are extinct,it would not be a problem...its only destroying natures beauty!
Q: the numbers i found on it are ay7648 ssh-310-nc
Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
Q: What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.
Q: Examples of filling and acceptance forms for tower cranes and examples of filling in.
3 no or no inspection items are completed". In the absence of such or part of the sub - item, it shall be drawn on its serial number".
Q: I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
Those stones are small compared to what cranes can lift. I did find this Liebherr the heavy equipment company have developed a new all terrain nine axle mobile crane that is the worlds most powerful. The Liebherr LTM 11200-9.1 has a maximum lifting capacity of 1,200 tons with its powerful 100 metre (328 ft) telescopic boom. another: Deira City Centre was the crane’s first lift as it assisted in completing the work in less than 30 hours in what would have otherwise taken an approximate 20 days. The monster machine can lift up to 1,200 tonnes and cover an area over 100m wide. The operational weight is 96 tonnes and the total counterweight is 202 tonnes. Average weight of the stones in the Great pyramid is 2.5 tonnes. So either of those cranes could lift over 400 of these at once.
Q: My dad has some old tools and he is wondering if the company is still around, or what happened to it. A yahoo search revealed little.
Hot jobs- fashion Champions- A Extraordinary- B Hot Music- 1995 Villian-A Famous First- A Spiral Frog- e
Q: I need a answers to these questions for a school project.These questions are:-How and when did it occur when the Siberian White Crane got threatened and critically endangered?What are the causes of this environmental issue?What are the effects of this environmental issue?What has or is being done to prevent such and environmental issue occurring again?Thanks, it will really help me with my final mark.
Check okorder . There is some very interesting information at this site.
Q: A. Load capacityB. Fluid leaksC. Clearance for swing radiusD. Wire rope wear and sheavesE. All of the above must be inspected before operating a crane
Load capacity is not required to inspect provided that the crane was inspected by third party and certified to the loads
Q: A crew built this huge crane to build an office building next to my house.... There is a huge flag hanging from the top of it.... Why does the construction company do this???
Wind becomes an issue when lifting large loads with a crane that has a long boom. On some large cranes you may see an anemometer near the end of the crane's boom. The crane operator will usually not make certain heavy lifts if the wind speed is too high. If the crane does not have an anemometer, they may be using a flag to tell them the direction of the wind and to give them a rough estimate of wind's speed.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords