• Steel Formwork System 1
  • Steel Formwork System 2
  • Steel Formwork System 3
Steel Formwork

Steel Formwork

Ref Price:
$200.00 / m² get latest price
Loading Port:
XINGANG
Payment Terms:
TT or LC
Min Order Qty:
55 Cubic Meters m²
Supply Capability:
5000 Cubic Meters per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Steel Formwork 
 

Type:  Plywoods 

 

Place of Origin:  China (Mainland) 

 

Brand Name:  CMAX
 
Usage:  Outdoor 

 

Grade:  First-Class 

 

Main Material:  Poplar 

 

Formaldehyde Emission Standards:  E1 

 

Plywood Type:  13-Ply Boards 

 

Film:  black,brown,red,anti-slip 
 
Core:  poplar,hardwood,eucalyptus,combi,birch 

 

Glue:  melamine WBP,phenolic

 

WBP  Size:  1220*2440mm,1250*2500mm 

 

Thickness:  9mm,12mm,15mm,18mm,21mm 

 

Pressing:  1 time,2 times 

 


Packaging & Delivery Steel Formwork  


Packaging Detail: inner with plastic bag,outer with carton board or thin plywood then fastened by steel belts with pallet

 

Delivery Detail: Within 15 days after receiving deposit or original L/C at sight

 


Specifications Steel Formwork

 


1)Film:brown,black,red,anti-slip

 

2)Core:poplar,hardwood,combi,birch

 

3)Glue:melamine WBP,phenolic WBP

 

4)Useage:construction


 

Item

Film faced plywood/Marine plywood/Construction plywood

Face/Back

Brown film,Black Film,Red film,Anti-slip film

Core

Poplar,hardwood,Eucalyptus, Poplar, Birch

Glue

Melamine WBP glue,Phenolic WBP glue

Size(mm)

1220×2440mm,1250×2500mm or as request

Thickness(mm)

9mm,12mm,15mm,18mm,21mm

Moisture

6-12%

Thickness tolerance

+/-0.5mm

 

Packing

inner with plastic bag,outer with carton board or thin plywood then fastened by 4×6 lines steel belts with pallet

Quantity

20’GP

8 plts/22M3

40’GP

16 plts/48M3

40’HQ

18 plts/55M3

Useage

Using for making construction, industry

MOQ

1×40'HQ

Payment Terms

TT:30% deposit, the balance agaist B/L copy

L/C: irrevocable L/C at sight

Delievery Time

Within 15 days after receiving 30% deposit or original L/C at sight

 

 

 

 

 

 

Q:What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Q:The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
We are a national comprehensive Class-A scientific research and design unit, an internationalized engineering group company and a key national-level hi-tech enterprise, and is the engineering technical platform of China National Building Material Co., Ltd.

1. Manufacturer Overview

Location Shanghai,China
Year Established 1949
Annual Output Value Below US$1 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port SHANGHAI
Export Percentage 91% - 100%
No.of Employees in Trade Department 200
Language Spoken: English,Chinese
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords