Single-side Climbing Bracket CB240&CB210
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Sets set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1 . INTRODUCTION OF Single-side Climbing Bracket CB240&CB210
They are framework brackets for supporting large-area wall formwork.
Typical application for the CB240&CB210 are pier and column/shear wall/core wall/in the building.
CB210 has smaller size than CB240,it will be cost effective in some codition.
2 . CHARACTERISTICS OF Single-side Climbing Bracket CB240&CB210
High bearing capacity
The high loading capacity of the brackets allow very large scaffold units.This saves the number anchor points required as well as reducing climbing times.
Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold,both can be moved as a single climbing unit by crane.Thus valuable time-savings can be achieved
Fast striking process without a crane
With the retrusive set,large formwork elements can also be retracted quickly and minimum of effort.
Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together,without scaffolding but can work safely in spite of your high location
3.PROJECT APPLICATION OF Single-side Climbing Bracket CB240&CB210
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q: The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
1. Manufacturer Overview
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single-side Climbing Bracket CB240&CB210
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Sets set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords