• SPU301Single-Component Polyurethane Waterproofing Paint System 1
  • SPU301Single-Component Polyurethane Waterproofing Paint System 2
SPU301Single-Component Polyurethane Waterproofing Paint

SPU301Single-Component Polyurethane Waterproofing Paint

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
500000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SPU 301Single-Component Polyurethane Waterproofing Paint is made out of the main materials 

of isocyanate and polyether polyol, together with various auxiliaries and fillers by polyreaction ,we coat it on the 

waterproofing base, after chemical reaction of NCO terminal group of polyurethane prepolymer and moisture in air, it 

forms a jointless , flexible and strong rubber waterproofing film.

Advantages

Single component, being available after open the paint can, 

convenient construction.

·High tensile strength, large elongation, good elasticity, 

perfect low and high temperature resistance, and being 

adaptive to shrinkage, fracture and deformation of base.

·Strong bonding strength, no need to apply brushing coat of 

base treating agent on various qualified base surfaces.

·Large single time coating thickness, compact film, no 

pinhole, no bubble.

·Film is formed by chemical reaction, long term resistance 

of water erosion, corrosion resistance, mould resistance and 

fatigue resistance;

·Environmental protection, contains no benzene or coal 

tar due to usage of high boiling point solvent, adding solvent 

during construction is unnecessary.

·Cold construction:easy to use.

Application Range

Adaptive to basement (basement of building, basement 

parking lot, open-cut subway and passageway).

·Kitchen, bathroom, floor,balcony, non-exposed roof.

·Waterproofing engineering of swimming pool, man-made 

fountain, water pool and water canal.

·Roof waterproof engineering for parking lot and square .

Reference Dosage

For each millimeter thick film, coating dosage weight is 

about 1.4-1.7kg/ ㎡ .


Q:Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q:How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q:Why should the use of high pressure perfusion waterproof plugging method
High pressure grouting construction principle: is a special high-pressure grouting waterproof material through the high-pressure infusion equipment into the concrete crack structure extended until all the cracks (including the naked eye is difficult to meet) filled with water (water) with the cross-linking reaction, Release a large number of carbon dioxide gas, resulting in secondary pressure, high pressure and secondary pressure will be pressed into the elastomer and filled with all the gaps, to stop the purpose of leakage, it can be said that the best performance of plugging material,
Q:What is the difference between finished mortar and cement mortar?
Finished mortar for dry areas, because the addition of lime, lime water retention is good; cement mortar for wet areas, because the high strength.
Q:Villa roof leakage what general reasons, what materials to remedy
Third, for some of the city building cover the construction of red tiles leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package.
Q:Eastern rainbow waterproof how to do
Do not know where you use, waterproof as if a lot of materials. I know there are coiled, painted.
Q:How does the waterproofing membrane work?
4, rolling the membrane: the first turn up the end of 1m long, with a long torch melting the bottom of the hot melt adhesive, the rapid paste fixed on the grassroots, and then re-harvest the rest of the volume. The gunmen stood on the paved webs, aligned with the corners of the rolls and the surface of the base layer with the flame of the long gun, and slowly rolled the edges by melting the hot melt. The web is pasted on the base;
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
three, if the roof is only the original did not do waterproof, only need to remove the leaky parts of 2 ~ 3cm deep after cleaning, you use asphalt watering, and now have finished asphalt coating, and so on when the sunny day to deal with the basic It will not leak. If there is a waterproof layer is too much trouble, to be around a range of waterproof tick, re-do waterproof, do when the attention and the original waterproof junction to do reinforcement layer. There are many ways to deal with leak detection, or to find some professional leak-proof companies to deal with this problem.
Q:Home improvement waterproofing problem
2, the ground waterproof layer generally turned 20 cm. Use the shower parts generally do more than 2.2 meters.
Q:What are the key points and contents of the quality control of waterproof material?
1, polymer cement waterproof coating: it consists of a variety of water-based polymer emulsion and a variety of additives mixed with high-quality cement powder composition. Because of its high cost of polymer emulsion components (about 19,000 yuan / T), and the low cost of powder (about 800 yuan / T), it is because the liquid material, powder huge spread, the vast majority of fraud is to use 801 Glue + fossil powder + green dyestuff + cement blending; the other is to change the liquid material, the proportion of powder will be your liquid material consumption, as much as possible to increase the amount of powder. Resulting in poor waterproof coating adhesion, intolerance, after the completion of the finished product should not be too hard to pull down by hand, and was not much ductility of the sheet or even hand rub a few times into a powder, with blisters Will break down into small pieces. Can also be used to cut the finished product coating and then placed in the refrigerator freezer room after 8 hours to remove, gently forced to break will be broken, and the national standard requirements of the material to achieve low temperature flexibility -10 ℃.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords