• Roofing Breathable Foils (c90~160) System 1
  • Roofing Breathable Foils (c90~160) System 2
  • Roofing Breathable Foils (c90~160) System 3
Roofing Breathable Foils (c90~160)

Roofing Breathable Foils (c90~160)

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

ceiling roof material1.5mx50m
Waterproof Class W1
SD-value 0.02m
Vapor permeability: 2250g/m2/24h
UV re

1) Introduction of  ceiling roof material

  1.    Breathable Membrane is a water resistant membrane but with high vapour permeability, use as diffusion open roofing felts under pitched roof tile or vapour permeable barrier housewraps on timber frame walls

  2.    Breather membrane functions as a weather-resistant barrier, preventing rain from getting into the roof or wall assembly while allowing water vapor to pass to the exterior.

  3.    Breather membrane may also serve as an air barrier if it is sealed carefully at seams.

  4.    Breathable Membrane have good "water resistance", good "water vapor permeability", and good "air barrier properties".

2) ceiling roof material Specification
13-layers laminatedPP nonwoven+PE film+PP nonwoven
2Products range80g,90g,100g,120g,140g,160g/m2.
3Roll size1.5m x 50m
4Water resistantClass W1
5SD-value0.02m
6Vapor permeability>2250g/m2/24h
7UV resistant>3month
8Test to EN13859-1Pass -- CE mark available

3)Key Features of ceiling roof material

1CE certificated, high quality with competitive price
2Waterproof & vapour permeable
3Excellent tensile and nail tear strength
4Good flexibility and ductility
5Light weight and thin, slip-resistant surface
6Simple handling and easy to use
7Energy saving
8Long term durability
9Totally recyclable
10For both wall and roof applications


Q: How to ensure the waterproof quality of the underground shear wall (retaining wall)?
1, when the basement buried depth is not large, you can use the digging method, once in place, and then press the first on the next, the order of construction.
Q: Waterproof mortar expensive or dry mortar expensive
Waterproof mortar more expensive. Because waterproof mortar compared to dry mortar, to add another waterproofing agent, emulsifier and other substances. Waterproof mortar regardless of the cost or transport are more cost-effective.
Q: What material is used for waterproofing of tarpaulin
Polypropylene Coil is only suitable for use in the top, waterproofing membrane is mainly used for building walls, roof, and tunnels, highways, landfills, etc., to resist the external rain, if it is home improvement Waterproof with this is not good, with tar ingredients, pollution of the environment.
Q: Home improvement waterproofing problem
3, waterproof as to do more than 2 centimeters of closed water 24 hours or more closed water test, check whether there is leaking and dampness downstairs phenomenon.
Q: Do you use the waterproof material on the building to be harmful to the human body?
Of course harmful, not just this particle, there are auxiliary materials are also toxic.
Q: Oriental rain rain waterproof how to
2, Oriental rain rain waterproof coating application If the above content can not accurately explain the East rain rain waterproof paint is good, then continue to look at the East Rainbow waterproof coating since the application of this Examples, I believe that most consumers can not say. Oriental Yuhong waterproof coating with its excellent product performance is applied to the Great Hall of the People, China Millennium Monument, the Three Gorges Hydropower Station, Beijing Metro, Capital Airport, Beijing Wuhuan, Sixth Ring, Beijing-Shanghai high-speed, directly under the central grain depot, China Central Television, National Aquatics Center (Water Cube), National ...
Q: What should you pay attention to before the construction of the basement waterproofing membrane?
3, painting the bottom line: for the reasonable arrangement of the daily pavement workload, must first on the basis of the program according to set the program to draw a good dividing line, the entire track and field into pieces, and then press the block by pavement. In order to ensure smooth drainage and less joints and other requirements, the use of the first outer ring after the construction process.
Q: How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q: Finished house bathroom waterproof household acceptance should be how to accept?
4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
Q: Waterproof material water leakage construction should pay attention to what
Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords