Single-Side Climbing Bracket SCB180 formwork system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Single-side Climbing Bracket SCB180:
With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.
Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.
The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.
Characteristics:
◆ Economical and safe anchoring
The M30/D20 climbing cones have been designed especially for single-sided concreting using
SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still
fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.
◆ Stable and cost-effective for high loads
generous bracket spacings allow large-area formwork units with optimal utilization of the bearing
capacity. This leads to extremely economical solutions.
◆ Simple and flexible planning
With SCB180 single-sided climbing formwork, circular structures can also be concreted without
undergoing any large planning process. Even use on inclined walls is feasible without any special
measures because additional concrete loads or lifting forces can be safely transferred into the
structure.
- Q: Template support did not stand good, how to remedy the lower floor?
- In fact, found before pouring in the jack can be used to jack up the reinforcement, in the corner of the ramp support; see how much sink, if the tolerance within the allowable time to the top of the ceiling with a network of paint on the OK; if more than the standard requirements only play Chiseled, it is recommended that all chisel, it is best to hit the wall position in the beam before pouring pulp.
- Q: The more specific the better, it is not hope to have a smaller range, please, thank you!
- You have asked this question before, but now there is no clear answer, and now are usually used to calculate the calculation software. General pole spacing of 600 ~ 1200mm, the distance between the horizontal bar is generally about 1 ~ 1.5mm.
- Q: Does the template support of the beamboard contain the full red scaffolding under the beam?
- Of course, according to theory, this full house is not a scaffolding shelf, is the template bracket.
- Q: How to use template support?
- According to your picture, you can determine this is the cast-in-place concrete board full of support. Generally set full support, the distance between the support in general according to the vertical and horizontal 600mm spacing to consider, the lower part of the distance from the standing surface of 200mm set sweep, the middle set a horizontal bar, the upper part of the beam at the end of the set of cross bar, mainly play a role in supporting the beam plate.
- Q: The use of new type of shear wall template support structure cost and rental cost
- Single-storey building area of 600 square meters, 30 layers, 3 meters high, single building 30 layer * 600 square meters = 18000 square meters; shear wall development area (dip gray surface) by construction area to take 2 times, Meter * 2 = 1200 square meters * 20 kg = 24 tons * 4900 yuan = 117600 yuan.
- Q: Building template support structure has been widely used
- In the current housing construction are required to achieve a certain level of engage in shock, so the general buildings are cast-in-place floor and shear wall structure, so the construction template support structure has been widely used, the national timber increasingly depleted, the domestic north and south are limited Deforestation, steel shear wall template support will become a trend in the future cast-in-place concrete support frame.
- Q: Template Support System Safety Control
- Strengthen design control. Fastener type steel pipe stent support system must have the design calculation and erection program. The calculation content is generally: the strength of the pole, stiffness, stability, fastening resistance of the fastener, the horizontal bar of the strength and deflection of the calculation, the base capacity of the foundation or support the floor of the bearing capacity.
- Q: Reinforced concrete shear wall is supported by the use of prefabricated concrete strips as a support on both sides of the template, the country is allowed to use
- For no protection (waterproof, explosion-proof, etc.) requirements, this is possible, as long as the strength of the support bar is greater than or equal to the strength of the wall on it.
- Q: Main and vice keel upgrade modification - the new building template support birth opportunity
- Deputy keel directly on the main keel, and the use of the same method of wood, easy to operate. The vice keel is designed for opening, reducing the weight, reducing your costs, and facilitating connection to the template when the bearing capacity is allowed
- Q: 400 thick concrete roof template support system need expert demonstration?
- No need. Because 400mm thick is very common, the saying goes to stand the top of the jack - are now steel pipe stent, generally do not support the phenomenon can not afford
Send your message to us
Single-Side Climbing Bracket SCB180 formwork system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches