• Single-Side Climbing Bracket SCB180 formwork system System 1
  • Single-Side Climbing Bracket SCB180 formwork system System 2
Single-Side Climbing Bracket SCB180 formwork system

Single-Side Climbing Bracket SCB180 formwork system

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Q: The template supports how security issues are under the supervision notice
There are many types of supervision, need that kind. The specific circumstances of the specific office. And then the written supervision notice rectification.
Q: The more specific the better, it is not hope to have a smaller range, please, thank you!
Construction engineering template works. Height of 6 meters long and 8 meters. Pole spacing. Horizontal spacing should be how much
Q: Roof plate support combination structure
Deputy keel directly on the main keel, and the use of the same method of wood, easy to operate. Vice keel for the hole design, in the case of bearing capacity to reduce the weight, reduce your costs, but also easy to connect with the template.
Q: The amount of material is 70.66M2, the height of 5.2M plate thickness 120MM then its template to support the amount of high project is the amount of more than 3.6 meters per 1 meter per meter to calculate the template to support the high project I know, Asked how the template to support the high amount of how to get the project.
This question comes from the "civil engineering measurement and pricing practice" on page 259 3-3-3 example. This problem has a beam plywood template, steel support project volume (with formula) = 70.66 level and the beam plate support ultra-high engineering volume = 72.93 level and no additional formula. The Landlord would like to know how this 72.93 level by 70.66 flat after what calculated! I am also wondering, hope my supplement is valid, but also hope to get the answer
Q: Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Scaffolding must be set to vertical and horizontal sweepers. Longitudinal sweeping pole should be fixed at right angles to the base of the epithelium is not greater than 200mm on the pole, the horizontal sweep pole should also be used at right angle fasteners fixed in the vertical under the pole on the pole. When the base of the pole is not at the same height, the height of the longitudinal sweeping pole must be extended to the lower span of the two spans and the pole fixed, the height difference should not be greater than 1M. The distance from the pole shaft above the slope to the slope should not be less than 500mm.
Q: How is the identification of tall template works?
[2009] No. 87 provides more than 5 meters of the template support project for the more dangerous sub-project, more than 8 meters for more than a certain size of the larger dangerous sub-project.
Q: Building template support structure has been widely used
The construction quality of the new building construction module supporting system can be completely comparable to the quality effect of the large steel formwork. It is through any combination of various locks, all the template firmly solidified into a whole, due to the cross-sectional size of the various parts of the standard uniform, the vertical deformation of the wall are within 3mm (advanced plaster). After removing the template, the wall fully achieved the effect of clear water concrete. It is possible to avoid the plastering process of the later stage of the wall decoration, not only save the material, but also greatly reduce the cost of labor costs.
Q: Building template support system force calculation? Is to calculate the support system can withstand the upper pressure!
Looking for the building structure book to see, the formula so much and how to give you online to play? That bad sign you know that simple, you can calculate the steel frame structure on it
Q: What is a template for pulling bolts
To the stencil fixed, a two-headed round bar, insert the template, the two tied to the nut
Q: 400 thick concrete roof template support system need expert demonstration?
We can increase the column density can be appropriate. Do not need to use expert argument.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches