• Single-Side Climbing Bracket SCB180 formwork system System 1
  • Single-Side Climbing Bracket SCB180 formwork system System 2
Single-Side Climbing Bracket SCB180 formwork system

Single-Side Climbing Bracket SCB180 formwork system

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Q: How does the new building shear wall template support safe operation?
Tian Jian Building Materials Co., Ltd. Shear wall template support known as the construction of the construction area of small assistants, it can be flexible to adjust the length and height, to adapt to any circumstances of the construction, to help the construction of construction companies to solve one after another construction problem
Q: The template supports how security issues are under the supervision notice
You 1 1 rectification, and then follow the results of the rectification of the truth. You do not rectification, reply to the supervision will still give you back, or else people will not send a notice. Do a good job to do a good attitude, especially involved in security issues. Since the supervision issued to you is a security notice, that things are more serious. Now you are doing is: one by one in a regular manner in accordance with the requirements of the field rectification, rectification after the end of a written reply to close the notice.
Q: The more specific the better, it is not hope to have a smaller range, please, thank you!
Construction engineering template works. Height of 6 meters long and 8 meters. Pole spacing. Horizontal spacing should be how much
Q: More than a certain size of the larger risk of the template works and support system which include
Concrete frame support works: erection height of 5m and above; erected span of 10 m and above; construction of the total load of 10KN / ㎡ and above; concentration line load 15KN / ㎡ and above; height greater than the support level of projection width and relatively independent of non-contact components of concrete Template support project.
Q: The problems of improper matching of template supporting system and preventive measures
Template support matching improper phenomenon due to the template support system matching and support methods improperly, structural concrete pouring deformation.
Q: Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Scaffolding must be set to vertical and horizontal sweepers. Longitudinal sweeping pole should be fixed at right angles to the base of the epithelium is not greater than 200mm on the pole, the horizontal sweep pole should also be used at right angle fasteners fixed in the vertical under the pole on the pole. When the base of the pole is not at the same height, the height of the longitudinal sweeping pole must be extended to the lower span of the two spans and the pole fixed, the height difference should not be greater than 1M. The distance from the pole shaft above the slope to the slope should not be less than 500mm.
Q: Building template support structure has been widely used
The construction quality of the new building construction module supporting system can be completely comparable to the quality effect of the large steel formwork. It is through any combination of various locks, all the template firmly solidified into a whole, due to the cross-sectional size of the various parts of the standard uniform, the vertical deformation of the wall are within 3mm (advanced plaster). After removing the template, the wall fully achieved the effect of clear water concrete. It is possible to avoid the plastering process of the later stage of the wall decoration, not only save the material, but also greatly reduce the cost of labor costs.
Q: Frame support system in the framework of the support system of wood support has been unable to withstand the pressure, the use of steel frame as a wooden mold support system, with steel pipe as a support system used in the bolt fasteners, etc., how much money Ton. How much is a fastener, the above is not used in the construction industry used in the external scaffolding, stressed! The Is the kind of support system as a wood template! Please give the professionals a detailed answer! There is the price, that place to sell? The
Tube is tons of billing, because the wall thickness is different so the price is different, it should be about 6000 it, of course, the pipe is good or bad, the price is different. Bolt site are called fasteners, fasteners, of course, there are weight of the small 1.4 pounds of the general also 1.7 pounds, it should be about 4.0 it
Q: Foundry boutique building foundation · New type of shear wall template support
In view of the above problems, Changli Tianjian developed and improved the new shear wall template support system, using a cold rolled steel made of retractable vertical beams and different specifications of the beam (0.6,0.9,1.2,1.5,1.8,2.4 m). The vertical beam can be freely stretched between 2.6 and 3.0 meters (available according to customer requirements). The beams are docked through 0.9 and 1.2 m fittings, which fundamentally solve the problems of wall width and wall height. problem.
Q: What is the meaning of the template bearing surface elevation in the bridge specification?
There is a pre-camber or pre-elevation between the bridge base elevation and the design elevation, since the template is not stressed before the concrete is poured,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches