• Single Side Climbing Bracket SCB180 for Support System 1
  • Single Side Climbing Bracket SCB180 for Support System 2
Single Side Climbing Bracket SCB180 for Support

Single Side Climbing Bracket SCB180 for Support

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 m
Supply Capability:
80000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Single Side Climbing Bracket SCB 180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are

transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and

bank vaults.The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


2. Main Features of Single Side Climbing Bracket SCB 180

Economical and safe anchoring

Stable and cost-effective for high loads

Simple and flexible planning


3. Single Side Climbing Bracket SCB 180 images

Single Side Climbing Bracket SCB180 for Support


4. Single Side Climbing Bracket SCB 180 Specifications

The M30/D20 climbing cones have been designed especially for single-sided concreting using SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect. generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.

With SCB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.


5. FAQ of Single Side Climbing Bracket SCB 180

 

1) What can we do for you? 

    .We can ensure the quality of Single Side Climbing Bracket SCB 180 panel and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.


Q: How does the new building shear wall template support safe operation?
Shear wall template support system consists of the following parts: bars, vertical bars, corners, Yang angle, locks, hole card, wall bolts
Q: Template support product features
The light rod is not only the material, but also more flexible and flexible, fastener is a must. Compared to wooden beams, the building structure is more precise and firmer. So that the construction site beautiful and tidy, greatly enhance the corporate image, highlight the strength of enterprises.
Q: Scaffolding structure template support frame type
(1) single pole support frame; 2) double pole support frame; 3) lattice pillar support frame (support frame formed by lattice column group); 4) mixed pillar support frame (mixed with single Pole, double pole, lattice column support frame).
Q: The more specific the better, it is not hope to have a smaller range, please, thank you!
Now many are by experience to row. In fact, the distance between the pole and the main Leng and sub-Leng's strength has a great relationship. Your main shock and sub-Leng may be because the intensity is relatively low, then the pole spacing is certainly relatively small. Otherwise it will increase.
Q: The use of new type of shear wall template support structure cost and rental cost
Single-storey building area of 600 square meters, 30 layers, 3 meters high, single building 30 layer * 600 square meters = 18000 square meters; shear wall development area (dip gray surface) by construction area to take 2 times, Meter * 2 = 1200 square meters * 20 kg = 24 tons * 4900 yuan = 117600 yuan.
Q: What is the difference between a full-screen stent and a floor-mounted stent?
Any of the templates and brackets that bear the vertical load are supported on relatively hard fulcrums.
Q: Frame support system in the framework of the support system of wood support has been unable to withstand the pressure, the use of steel frame as a wooden mold support system, with steel pipe as a support system used in the bolt fasteners, etc., how much money Ton. How much is a fastener, the above is not used in the construction industry used in the external scaffolding, stressed! The Is the kind of support system as a wood template! Please give the professionals a detailed answer! There is the price, that place to sell? The
That is the flower rod bolts, generally not according to tons of pricing, you want to sell the bargain business bargaining.
Q: Template Support System Safety Control
Template support system must strictly implement the relevant provisions of the national standard, take a sound and reliable security technical measures, and completely eliminate the template support system collapse occurred. Scientific management and advanced technology is to do a good job of template support system effective guarantee, to rely on scientific management and technology, can really control the template support system strength, stiffness and stability
Q: Reinforced concrete shear wall is supported by the use of prefabricated concrete strips as a support on both sides of the template, the country is allowed to use
Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.
Q: What is the meaning of the template bearing surface elevation in the bridge specification?
There is a pre-camber or pre-elevation between the bridge base elevation and the design elevation, since the template is not stressed before the concrete is poured,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches