• Single Side Climbing Bracket SCB180 for Support System 1
  • Single Side Climbing Bracket SCB180 for Support System 2
Single Side Climbing Bracket SCB180 for Support

Single Side Climbing Bracket SCB180 for Support

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 m
Supply Capability:
80000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Single Side Climbing Bracket SCB 180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are

transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors. Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and

bank vaults.The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


2. Main Features of Single Side Climbing Bracket SCB 180

Economical and safe anchoring

Stable and cost-effective for high loads

Simple and flexible planning


3. Single Side Climbing Bracket SCB 180 images

Single Side Climbing Bracket SCB180 for Support


4. Single Side Climbing Bracket SCB 180 Specifications

The M30/D20 climbing cones have been designed especially for single-sided concreting using SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect. generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.

With SCB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.


5. FAQ of Single Side Climbing Bracket SCB 180

 

1) What can we do for you? 

    .We can ensure the quality of Single Side Climbing Bracket SCB 180 panel and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.


Q: Template support did not stand good, how to remedy the lower floor?
In fact, found before pouring in the jack can be used to jack up the reinforcement, in the corner of the ramp support; see how much sink, if the tolerance within the allowable time to the top of the ceiling with a network of paint on the OK; if more than the standard requirements only play Chiseled, it is recommended that all chisel, it is best to hit the wall position in the beam before pouring pulp.
Q: How to use template support?
According to your picture, you can determine this is the cast-in-place concrete board full of support. Generally set full support, the distance between the support in general according to the vertical and horizontal 600mm spacing to consider, the lower part of the distance from the standing surface of 200mm set sweep, the middle set a horizontal bar, the upper part of the beam at the end of the set of cross bar, mainly play a role in supporting the beam plate.
Q: Building template support structure has been widely used
The construction quality of the new building construction module supporting system can be completely comparable to the quality effect of the large steel formwork. It is through any combination of various locks, all the template firmly solidified into a whole, due to the cross-sectional size of the various parts of the standard uniform, the vertical deformation of the wall are within 3mm (advanced plaster). After removing the template, the wall fully achieved the effect of clear water concrete. It is possible to avoid the plastering process of the later stage of the wall decoration, not only save the material, but also greatly reduce the cost of labor costs.
Q: Unilateral support basement wall waterproof protective layer do not do it? Will there be a broken ring on the waterproofing membrane? Is it possible to destroy the process?
How to do it on how to do it, brother, you have seen a few do the protective layer of the basement does not leak, huh, huh!
Q: A load that can be sustained by a fastener
(Static load + dynamic load) * safety factor = construction load. A fastener carrying 3 tons.
Q: Frame support system in the framework of the support system of wood support has been unable to withstand the pressure, the use of steel frame as a wooden mold support system, with steel pipe as a support system used in the bolt fasteners, etc., how much money Ton. How much is a fastener, the above is not used in the construction industry used in the external scaffolding, stressed! The Is the kind of support system as a wood template! Please give the professionals a detailed answer! There is the price, that place to sell? The
Pad wood template should be called I-shaped steel bar, there are several other names of steel "H-beam, T-beam, I-shaped steel, channel, angle" like these large steel market are sold
Q: Template Support System Safety Control
Template support system must strictly implement the relevant provisions of the national standard, take a sound and reliable security technical measures, and completely eliminate the template support system collapse occurred. Scientific management and advanced technology is to do a good job of template support system effective guarantee, to rely on scientific management and technology, can really control the template support system strength, stiffness and stability
Q: Reinforced concrete shear wall is supported by the use of prefabricated concrete strips as a support on both sides of the template, the country is allowed to use
Can protect the template from damage, extend the life of the template. Easy to operate, save time and labor, will not produce rust, can be removed from the wall repair, can significantly reduce the cost of the project costs.
Q: New shear wall template support
The new Shear Wall Templates supports us to provide a full range of services. Before you order, we will customize a reasonable construction plan, product usage, and what products for each wall Amount, will help you count.
Q: In addition, for example, in the 30-meter-high pier body pouring continuous beam 0 # block, beam 0 # block can be used to support the bracket (usually block 0 block will be surrounded by the entire pier), but 30 meters high Of the scaffolding if not connected with the bracket, then what is the way to make the stability of scaffolding requirements? Is it only anchoring? Please master answer.
The use of pier body construction rod hole, so that scaffolding and pier body consolidation, improve stability

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches