• Single-side Climbing Bracket SCB180 formwork system System 1
  • Single-side Climbing Bracket SCB180 formwork system System 2
Single-side Climbing Bracket SCB180 formwork system

Single-side Climbing Bracket SCB180 formwork system

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Q: Template support did not stand good, how to remedy the lower floor?
In fact, found before pouring in the jack can be used to jack up the reinforcement, in the corner of the ramp support; see how much sink, if the tolerance within the allowable time to the top of the ceiling with a network of paint on the OK; if more than the standard requirements only play Chiseled, it is recommended that all chisel, it is best to hit the wall position in the beam before pouring pulp.
Q: Construction side without approval without authorization after removal of pouring with the template, what kind of remedial measures should be taken Thank you!
When the concrete scaffolding is actually used to support the upper structure, to the concrete conservation period is allowed to remove the general is more than the demolition, and then used in the above level, indoor support with the steel scaffolding does not meet the requirements of the scaffolding decoration, interior decoration With the full scaffolding in the decoration when re-erected. Outdoor scaffolding in the pouring concrete can be erected when the masonry and decoration.
Q: The problems of improper matching of template supporting system and preventive measures
Template support matching improper phenomenon due to the template support system matching and support methods improperly, structural concrete pouring deformation.
Q: Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole. Suzhou Zhicheng Construction Scaffolding Engineering Co., Ltd. is engaged in various: door scaffolding, trapezoidal scaffolding, all kinds of casters, steel pipe fastener channel leasing, construction site scaffolding erection, stage structures, interior and exterior decoration scaffolding
Q: How to use template support?
According to your picture, you can determine this is the cast-in-place concrete board full of support. Generally set full support, the distance between the support in general according to the vertical and horizontal 600mm spacing to consider, the lower part of the distance from the standing surface of 200mm set sweep, the middle set a horizontal bar, the upper part of the beam at the end of the set of cross bar, mainly play a role in supporting the beam plate.
Q: How is the identification of tall template works?
According to the current specification, the total load of the construction is more than 10kN / ㎡, the concentration of the concentrated line is more than 15kN / m or the beam cross-sectional area is 600 * 1200.
Q: Building template support system force calculation? Is to calculate the support system can withstand the upper pressure!
There is a PKPM software (CMIS), there are inside. Just enter the parameters and automatically generate the calculations. I suggest you can try. We are all using this. Including the external scaffolding, unloading platform design force calculation can be used.
Q: How long does the width of the template support more than how much height the beam can not be poured at the same time?
Tool-based template works: including sliding mode, climbing mold, flying mold works. Concrete template support works: erect height of 8m and above; erection span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above.
Q: What is a template for pulling bolts
To the stencil fixed, a two-headed round bar, insert the template, the two tied to the nut
Q: What is the meaning of the template bearing surface elevation in the bridge specification?
Elevation indicates the height of each part of the building, which is the vertical height of a certain part of the building relative to the reference plane (zero point of the elevation). In the construction drawing there is often a small right-angled isosceles triangle, the tip of the triangle or the up or down, which is the sign of the elevation.