Scaffolding Parts-Cold Galvanized Pin
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-cold galvanized Pin
Place of Origin: China (Mainland)
Brand Name: CMAX
Material: Q235/Q255/Q345/C45/etc
Standard: EN74,BS1139,JIS,AS1576,ISO9001:2008
Certificate: ISO 9001:2008/CE
Surface: HDG/galvanized/painted/etc
Use: suit for fasten
Thickness: 5.9-6.2mm
Weight: 0.12kg
Type of Mould: Stamp Die Mould
Quantity: 4 sets
Item |
Scaffolding Wedge |
Material |
Q235/Q255/Q345/C45/etc |
Dimensions |
0.12kg, or as your demands |
Surface |
Hot-dip galvanization/ electro galvanization /painted /or as your request |
Standard |
EN74,BS1139,JIS,AS1576,ISO9001:2008 |
Feature |
Skidprood, Autirust, High Breaking Strength,Durable, easy to assemble & dismantle |
Note |
OEM service is available |
MOQ |
1000pieces |
Package |
woven bags with pallets or plywood box, or as your request |
Payment Terms |
TT,L/C, we can contact in detail |
Delivery Time |
20-30days |
Packaging & Delivery of Scaffolding Parts-cold galvanized Pin
Packaging Detail: woven bags with pallets or plywood box, or as your request
Delivery Detail: 15-30 days after confirmation
Specifications of Scaffolding Parts-cold galvanized Pin
1.Name:wedge lock scaffolding
2.Material:Q235/Q255/Q345/C45,
3.Standard:EN74,BS1139,JIS,AS1576,ISO9001:20
Details of Scaffolding Parts-cold galvanized Pin :
Material: Ductile Iron
Surface : Galvanized
Colour: White or Yellow
Quality: High Level
Process: Casting
Package : Pallets or Crates or As Customer's Requirements
Develiry : 20days
Application: To fix the formwork frame and be used on formwork clamp
Scaffold for sale, scaffolding accessory scaffold wedge
1.Name: Scaffolding Parts-hot dip galvanized Pin
2.Produce Equipment: 2 sets 250t punch press/2 sets 160t punch press/3 sets punch press;
3.Produce Technology: stamping/pressing;
4.Produce Capacity: 100 tons/month
5.Mould: Stamp Die, 4 sets;
6.Output: 3000 pcs/day
Main Business:
1. System scaffolding:
Include: Kwikstage system scaffolding and accessories; Ringlock system scaffolding and accessories; Cuplock system scaffolding and accessories; Haki system scaffolding and accessories.
2. Couplers/Clamps:
We can manufacture all kinds of drop forged or pressed couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.
3. Frames
Mainly include: Ladder type frames and walk through (door type) frames, we can also manufacture as per your drawings.
4. Shoring Props
Quality shoring props of different specifications can be manufactured in our factory.
5. Planks/ Toe Board:
Both aluminum and steel planks can be manufactured in our factory.
6. Others
We can also manufacture casting parts, fences, ladders, steel trays/stillages and other related products that are needed in the erection of scaffolding.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q: The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Cold Galvanized Pin
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords