Scaffolding System Scissor Lift CHIAN !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Shandong, China (Mainland) | Brand Name: | JIURUI | Model Number: | SJY0.3-16 |
Load Capacit: | 300KG | Table Size: | 3150*1800 | lifting height: | 16m |
working height: | 17.7m | Overall Dimensions3: | 3700*2300*2950 | (Optional)Voltage: | 380 / 220/ 110 /415 v |
Power: | 2.2 kw | Net.weight: | 3900KG | product name: | hydraulic platform of scaffolding |
OEM: | yes |
Packaging & Delivery
Packaging Details: | plywood for outside and plastic film for inside |
Delivery Detail: | 15working days after get the rest payments |
Product Description
hydraulic platform of scaffolding for repairing in aerial work
Main feature
1) lifting is stable
2) convenient operation
3) safety and creditbility
4)CE certificated
Parameter:
1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m
2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs
Safety:
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs
2. the limit switch system helps the lift to stop at accurate position.
3. all the work platforms are passed 1.2 times loading test before leaving factory.
4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.
Application:
1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.
2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.
3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon.
Product List:
Model | Capacity | Table size | Max height | Work height | Total dimension | Net weight |
SJY0.3-4 | 300Kgs | 1500×750mm | 4m | 5.7m | 1850×900×1900mm | 400Kgs |
SJY0.3-6 | 300Kgs | 1500×750mm | 6m | 7.7m | 1850×900×1970mm | 650Kgs |
SJY0.3-8 | 300Kgs | 1650×1000mm | 8m | 9.7m | 2100×1200×2460mm | 1200Kgs |
SJY0.5-8 | 500Kgs | 1980×1220mm | 8m | 9.7m | 2500×1550×2380mm | 1400Kgs |
SJY0.8-8 | 800Kgs | 2000×1220mm | 8m | 9.7m | 2600×1550×2640mm | 1700Kgs |
SJY0.3-10 | 300Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1500Kgs |
SJY0.5-10 | 500Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1600Kgs |
SJY1.0-10 | 1000Kgs | 2220×l220mm | 10m | 11.7m | 2820×1720×2850mm | 2380Kgs |
SIY0.3-12 | 300Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2580Kgs |
SIY0.5-12 | 500Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2780Kgs |
SJY1.0-12 | 1000Kgs | 2600×1500mm | 12m | 13.7m | 3200×2015×3090mm | 3580Kgs |
SJY0.3-14 | 300Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3000Kgs |
SJY0.5-14 | 500Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3200Kgs |
SJY0.3-16 | 300Kgs | 3230×l600mm | 16m | 17.7m | 3700×2000×3030mm | 3900Kgs |
SJY0.3-18 | 300Kgs | 3230×l600mm | 18m | 19.7m | 3700×2000×3250mm | 4500Kgs |
SJY0.3-20 | 300Kgs | 3230×1600mm | 20m | 21.7m | 3700×2000×3450mm | 5100Kgs |
We are different,because…
we offer a ‘one-stop-shop’ for all your EWP needs
we can supply a comprehensive range of access equipment for any business or budget
we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine
we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island
our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time
we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms
we keep a full service history on your machine free of charge
we provide loan machines during rebuilds and extended repair jobs to minimise downtime
we offer a full-service workshop in Christchurch and service the whole country
we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)
all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).
- Q: Lifting equipment, chain hoist need maintenance?
- Main gear box lubrication: use 800 hours later, please change the oil, and then check every three months, if found inadequate, please add oil to add.
- Q: What are the points for attention in the course of transportation of double beam cranes?
- Transportation conditions, transportation conditions, including on-site transportation, road construction, inspection and commissioning, etc..(1) construction of road transportation on site. According to the shipping component vehicle load size, body size, grade and standard requirements to determine the construction of temporary road pavement width and subgrade, pavement structure, construction site of the road transport people.(2) check the routes and routes. Transport drivers in Zhengzhou steel company and the relevant personnel along the exploration of transport routes, smooth road, road slope and road turning radius, or wire obstacles such as bridge and culvert clearance size are higher.(3) test run. The transport frame of the largest size component shall be installed on the vehicle, and the dimensions of the components shall be simulated and tested along the transport road.
- Q: The principle of an air compressor for connecting two pistons
- In order to improve efficiency and reduce air temperature, intermediate cooling is needed. As the piston type air compressor air compressed by two stage low pressure cylinder pressure from p 1 to p 2, T l to T temperature by 2; and then flows into the middle cooler, at constant pressure of cooling water heat, the temperature is T L; the high pressure cylinder compression pressure to 3 P. As can be seen from the diagram, the air temperature T, l and T 2 entering the low pressure cylinder and the high pressure cylinder are located on the same isotherm 12 '3', and the two compression processes deviate from the isotherms. The same compression ratio p 3 / P 1 single stage compression process is 123 ", which is much higher than the two stage compression deviation from isothermal 12 '3', that is, the temperature is much higher. And the single stage compression work is equivalent to the area of 613 "46", and the two stage compression work is equivalent to the sum of 61256 and 52 '345 in the figure, and the work saved is equivalent to 2' 23 '32'. It can be seen that the staged compression can reduce the exhaust temperature, save compression work and improve efficiency.
- Q: The permanent magnet use principle
- The internal use of the high performance permanent magnetic materials of neodymium borax, can produce a strong suction in the magnetic circuit, the magnetic field lines so that the jack handle turn at work or in a closed state;
- Q: Classification of lifting tools
- Lifting tools can be divided into light and small lifting equipment, hoist and overhead monorail system according to different structures.
- Q: Working principle of mechanical screw jack
- The screw jack can support heavy load for a long time, the maximum lifting capacity has reached 100 tons, and it is widely used. When the lower part is loaded with a horizontal screw rod, the heavy object can be moved at a small distance.
- Q: Rack type lifting machine, rack press, rack lifting machine
- The rack press is the abbreviation of the press, hydraulic press and hydraulic press. The press refers to a kind of forming machine used for the pressure forming of the industrial products. The hydraulic cylinder is generally used, so it is also called the hydraulic press. In the building material industry, the press is the abbreviation of the brick press, and the press breaks up the dynamic brick machine and the automatic hydraulic brick machine.
- Q: What are the points for attention in the course of transportation of double beam cranes?
- The provision of means of transport, including the conveyance of vehicles and lifting tools, materials, etc..(1) the selection of transport vehicles and lifting tools. According to the shape, size and weight of the components, site transportation, lifting tools, road conditions and economic benefits, determine the appropriate type of vehicles and cranes, number of units and mode of shipment.(2) prepare tools and materials for shipment. Such as wire ropes, chains, clasps, baskets, bolts, jacks, flags, mats, boards, old tyres, etc..
- Q: What are the protective measures against crane injuries?
- Crane type selection is reasonable, the road is flat and solid, and should not work on the slope.
- Q: Do hardware or plastic factories have no need for cutting tools?
- Cutting tools must be needed. Hardware accessories refer to some small hardware, such as door locks, hinges, nuts and other mechanical components.
Send your message to us
Scaffolding System Scissor Lift CHIAN !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords