Scaffolding System Scissor Lift/Hydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Shandong, China (Mainland) | Brand Name: | JIURUI | Model Number: | SJY0.3-16 |
Load Capacit: | 300KG | Table Size: | 3150*1800 | lifting height: | 16m |
working height: | 17.7m | Overall Dimensions3: | 3700*2300*2950 | (Optional)Voltage: | 380 / 220/ 110 /415 v |
Power: | 2.2 kw | Net.weight: | 3900KG | product name: | hydraulic platform of scaffolding |
OEM: | yes |
Packaging & Delivery
Packaging Details: | plywood for outside and plastic film for inside |
Delivery Detail: | 15working days after get the rest payments |
Product Description
hydraulic platform of scaffolding for repairing in aerial work
Main feature
1) lifting is stable
2) convenient operation
3) safety and creditbility
4)CE certificated
Parameter:
1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m
2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs
Safety:
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs
2. the limit switch system helps the lift to stop at accurate position.
3. all the work platforms are passed 1.2 times loading test before leaving factory.
4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.
Application:
1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.
2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.
3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon.
Product List:
Model | Capacity | Table size | Max height | Work height | Total dimension | Net weight |
SJY0.3-4 | 300Kgs | 1500×750mm | 4m | 5.7m | 1850×900×1900mm | 400Kgs |
SJY0.3-6 | 300Kgs | 1500×750mm | 6m | 7.7m | 1850×900×1970mm | 650Kgs |
SJY0.3-8 | 300Kgs | 1650×1000mm | 8m | 9.7m | 2100×1200×2460mm | 1200Kgs |
SJY0.5-8 | 500Kgs | 1980×1220mm | 8m | 9.7m | 2500×1550×2380mm | 1400Kgs |
SJY0.8-8 | 800Kgs | 2000×1220mm | 8m | 9.7m | 2600×1550×2640mm | 1700Kgs |
SJY0.3-10 | 300Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1500Kgs |
SJY0.5-10 | 500Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1600Kgs |
SJY1.0-10 | 1000Kgs | 2220×l220mm | 10m | 11.7m | 2820×1720×2850mm | 2380Kgs |
SIY0.3-12 | 300Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2580Kgs |
SIY0.5-12 | 500Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2780Kgs |
SJY1.0-12 | 1000Kgs | 2600×1500mm | 12m | 13.7m | 3200×2015×3090mm | 3580Kgs |
SJY0.3-14 | 300Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3000Kgs |
SJY0.5-14 | 500Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3200Kgs |
SJY0.3-16 | 300Kgs | 3230×l600mm | 16m | 17.7m | 3700×2000×3030mm | 3900Kgs |
SJY0.3-18 | 300Kgs | 3230×l600mm | 18m | 19.7m | 3700×2000×3250mm | 4500Kgs |
SJY0.3-20 | 300Kgs | 3230×1600mm | 20m | 21.7m | 3700×2000×3450mm | 5100Kgs |
We are different,because…
we offer a ‘one-stop-shop’ for all your EWP needs
we can supply a comprehensive range of access equipment for any business or budget
we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine
we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island
our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time
we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms
we keep a full service history on your machine free of charge
we provide loan machines during rebuilds and extended repair jobs to minimise downtime
we offer a full-service workshop in Christchurch and service the whole country
we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)
all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).
- Q: What are the points for attention in the course of transportation of double beam cranes?
- Component preparation, component preparation, including component counting, inspection and appearance modification, etc..(1) counting the components, including the type and quantity of the components, checking the order of the components according to the lifting sequence of the components, and determining the sequence of the loading of the components.(2) inspection component. Including size, geometry, the placement of parts and rings, and the stability of the location of the installation hole and the hole through the hole and so on.(3) check the weld seam of the steel structure. Including the weld size, appearance and connections whether the design and specifications meet the requirements, such as beyond the allowable error, should be taken effective measures to deal with.(4) appearance inspection and modification of components. Found defects and damage, such as cracks, pits, broken edge, weld length, height is not enough, weld ash or porosity, should be modified and after welding, to transport and use.
- Q: The permanent magnet use principle
- The internal use of the high performance permanent magnetic materials of neodymium borax, can produce a strong suction in the magnetic circuit, the magnetic field lines so that the jack handle turn at work or in a closed state;
- Q: What are the heavy lifting units commonly used in hoisting operations?
- Lifting belt, wire rope sling and crowbar size etc.
- Q: When should the temporary fixing tool for lifting work be removed?
- Phosphating coating to improve the wear resistance and corrosion resistance of steel wire, not easy to wear and corrosion, is to improve the service life of wire rope reasons, smooth steel wire rope is being completely eliminated.
- Q: What important attention should be paid to large equipment?
- A fire extinguisher should be provided on the crane and rubber insulated mats shall be laid in the cab or the place of operation.
- Q: What are the protective measures against crane injuries?
- Avoid travel with load, short distance travel with load load can allow the weight of 70% members from the ground using 50cm.Two crane lifting reasonable load distribution, unified command and close coordination.The sling should be calculated and the binding method is reliable. Lifting tools are regularly checked.The center of gravity and the weight lifting point should be in the same vertical line, hanging point should be in the center of gravity above.The commander must be certified, in close coordination with the crane driver.It is prohibited for lifting heavy objects long time hanging in the air.To check the ring hook, hook ring welding is prohibited.
- Q: Hoisting safety notice
- Measures to prevent falling from the sky (1). The operator must use the seat belt correctly when doing aerial work. The seat belt should be hung high and lowered, and the hook ring at the end of the belt rope will be hung at the top, while the person will operate at the lower level. (2) in the upper use of the lever, people should stand firm, such as nearby scaffolding or already installed components, should be one hand, live, hand operation. Pry into the depth of insertion should be appropriate, if the move from a larger distance, it should gradually move, should not be anxious for success. (3) if workers need to work at high altitude, they should set up temporary operating platform as far as possible. The operation of Taiwan as a tool, the width is 0.8 ~ 1 m temporary splint in the upper column angle, below the location of 1.0m ~ 1.2m, and the welding work of workers can be corrected in the roof above. (4). For walking in the high altitude suspension truss on, should be set up on the safety railing. (5) ladders for climbing must be firm. When used, the rope must be fastened to the fixed member. The angle between the ladder and the ground is generally 65~70 degrees. (6). By the operator in the scaffold board, should be focused on, to prevent lead plate. (7) when installing a reserved floor or roof board, it should be covered with wooden planks in time. (8) the operator shall not wear hard soled shoes for aerial work.
- Q: The permanent magnet (permanent magnet sucker) the principle of who knows?
- The working principle as shown in Figure 1, when the permanent magnet sucker pole in figure (a) state, lines from the N pole of the magnet, the yoke, through a ferromagnetic workpiece, back into the S pole of the magnet yoke. In this way, can make the workpiece firmly attracted to the permanent magnet sucker working faces. When the poles in the graph (b) state, lines to permanent magnet sucker work closed loop is composed of magnetic pole, the permanent magnet sucker inside, almost no lines from the permanent magnetic chuck work faces, so the workpiece does not produce suction, can smoothly unload.
- Q: Is there a good steel lifting machine, the crane always binding steel plate, the efficiency is not high?
- Use electromagnetic chuck to lift, do not start loading and unloading
- Q: What is the working principle of a screw jack? What's the difference between an ordinary hydraulic jack and an ordinary hydraulic jack?
- Press a small piston with a handle and transfer power by hydraulic oil.The hydraulic jack uses Pascal's principle to retract the nut.
Send your message to us
Scaffolding System Scissor Lift/Hydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords