• Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 1
  • Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 2
  • Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 3
  • Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 4
  • Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 5
  • Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!! System 6
Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!!

Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!!

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2 set
Supply Capability:
200 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

Place of Origin:

Shandong, China (Mainland)

Brand Name:

JIURUI

Model Number:

SJY0.3-16

Load Capacit:

300KG

Table Size:

3150*1800

lifting height:

16m

working height:

17.7m

Overall Dimensions3:

3700*2300*2950

(Optional)Voltage:

380 / 220/ 110 /415 v

Power:

2.2 kw

Net.weight:

3900KG

product name:

hydraulic platform of scaffolding

OEM:

yes





Packaging & Delivery

Packaging Details:

plywood for outside and plastic film for inside

Delivery Detail:

15working days after get the rest payments

 

Product Description

 

hydraulic platform of scaffolding for repairing in aerial work        

 

Main feature


1) lifting is stable

 
2) convenient operation

 
3) safety and creditbility

 

4)CE certificated

 

 

 

Parameter:

1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m

2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs

 

Safety: 
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs 
2. the limit switch system helps the lift to stop at accurate position.

3. all the work platforms are passed 1.2 times loading test before leaving factory.

4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.

 

Application:

1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.

2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.

3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon. 

 

Product List:

Model

Capacity

Table size

Max height

Work height

Total dimension

Net weight

SJY0.3-4

300Kgs

1500×750mm

4m

5.7m

1850×900×1900mm

400Kgs

SJY0.3-6

300Kgs

1500×750mm

6m

7.7m

1850×900×1970mm

650Kgs

SJY0.3-8

300Kgs

1650×1000mm

8m

9.7m

2100×1200×2460mm

1200Kgs

SJY0.5-8

500Kgs

1980×1220mm

8m

9.7m

2500×1550×2380mm

1400Kgs

SJY0.8-8

800Kgs

2000×1220mm

8m

9.7m

2600×1550×2640mm

1700Kgs

SJY0.3-10

300Kgs

2100×l220mm

10m

11.7m

2700×1550×2380mm

1500Kgs

SJY0.5-10

500Kgs

2100×l220mm

10m

11.7m

2700×1550×2380mm

1600Kgs

SJY1.0-10

1000Kgs

2220×l220mm

10m

11.7m

2820×1720×2850mm

2380Kgs

SIY0.3-12

300Kgs

2550×1500mm

12m

13.7m

3150×1860×2850mm

2580Kgs

SIY0.5-12

500Kgs

2550×1500mm

12m

13.7m

3150×1860×2850mm

2780Kgs

SJY1.0-12

1000Kgs

2600×1500mm

12m

13.7m

3200×2015×3090mm

3580Kgs

SJY0.3-14

300Kgs

2990×1600mm

14m

15.7m

3600×2000×2850mm

3000Kgs

SJY0.5-14

500Kgs

2990×1600mm

14m

15.7m

3600×2000×2850mm

3200Kgs

SJY0.3-16

300Kgs

3230×l600mm

16m

17.7m

3700×2000×3030mm

3900Kgs

SJY0.3-18

300Kgs

3230×l600mm

18m

19.7m

3700×2000×3250mm

4500Kgs

SJY0.3-20

300Kgs

3230×1600mm

20m

21.7m

3700×2000×3450mm

5100Kgs

 

We are different,because…

  • we offer a ‘one-stop-shop’ for all your EWP needs

  • we can supply a comprehensive range of access equipment for any business or budget

  • we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine

  • we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island

  • our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time

  • we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms

  • we keep a full service history on your machine free of charge

  • we provide loan machines during rebuilds and extended repair jobs to minimise downtime

  • we offer a full-service workshop in Christchurch and service the whole country

  • we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)

  • all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).

 


Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!!

Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!!

Hydraulic Mobile Scaffolding Platform And Scaffolding System Scissor Lift from CHIAN CNBM !!!


Q: Please explain how to prevent the safety accidents in the process of tower crane installation and disassembly
Tower crane disassembly method and installation method is the same, the program is just the opposite. When folded, the building has been built, and the site is not so spacious as to be installed. Therefore, we should never take it lightly.1, tower crane demolition of the basic requirements and installation of the same.2, the process of disassembly is strictly prohibited to use cutting scarify.3, remove the bolts, pins, and spare parts should be packing plate joint custody.4 、 the operation room is closed with iron sheet.5, the rotating machinery for maintenance, oil, sealed.6, the appearance of paint anti-corrosion.7, after the removal of tower cranes, conditional storage of the storage of some parts, unconditional storage part of the transfer to the vicinity of the special line stacking, ready for shipment.
Q: What are the points for attention in the course of transportation of double beam cranes?
(L) formulation of transport programmes. According to the basic form of the structural components of the plant and the specific conditions of the lifting equipment and transportation vehicles, a practical, economical and practical shipping scheme shall be worked out.(2) design and manufacture transport rack. A steel or wood carrier (Zhi Chengjia) is designed to produce various types of components according to the weight and size of the components. The utility model has the advantages of simple structure, reasonable and stable loading force, low center of gravity, light weight, steel saving, various types of components, convenient assembly and disassembly.(3) checking the strength of the component. The large roof, multi section columns, according to the shipping program to determine the conditions of crack resistance checking computations component in the most unfavorable section, avoid the cracks at the time of shipment, such as crack resistance is not enough, should reinforce appropriate.
Q: What's the difference between a pneumatic balancer and a spring balancer?
Without manpower, the workers' time and energy can be greatly saved. Spring balancer is a mechanical upgrade, the internal wire rope for lifting, can not realize the suspension of heavy load. The lift is also limited in weight, but the price has advantages over the pneumatic balancer. The two are not too comparable.
Q: The electromagnetic Jack does not seem to use the principle of electromagnetic induction.
As long as the electromagnetic jack, you cannot do without the principle of electromagnetic induction, electromagnetic Jack only with current, can be convenient to be and magnetic, so as to achieve the effect of suction on.
Q: The permanent magnet use principle
The working principle of permanent magnet lifting jack is the use of the principle of Faraday electromagnetic induction to manufacturing.
Q: Rack type lifting machine, rack press, rack lifting machine
Rack type lifting machine is mainly used for railway track laying and maintenance. The utility model is widely used for lifting and supporting the installation of various heavy objects and equipment in industrial and mining enterprises, as well as bridge erection. Rack Jack (also known as lifting machine) is also called manual lifting machine.
Q: What are the protective measures against crane injuries?
The crane to achieve the "ten not hanging": the hanging weight unknown is not suspended or overload, the command signal not unknown crane, crane, not illegal command hanging rickety bundle not hanging, hanging on someone without lifting, crane safety device is not hanging, hanging objects buried in the underground crane, workplace light the dark line of sight is not clear or not hanging, hanging crane cable-stayed and angular load did not take the corresponding protective measures are not hanging. The lifting operation shall not be carried out under the strong winds of grade six or six.
Q: Do you know the manufacturer of small lifting equipment?
Lifting equipment company operating mainly include: imports of high-end hand chain hoist, hoist, electric hoist, pneumatic hoist, permanent magnetic chuck, electronic hanging, lifting shackle, hardware tools, steel plate lifting clamp, sling, take-up binder, lifting sling, lifting tool and riot lifting chain etc..
Q: Do hardware or plastic factories have no need for cutting tools?
Cutting tools must be needed. Hardware accessories refer to some small hardware, such as door locks, hinges, nuts and other mechanical components.
Q: The permanent magnet (permanent magnet sucker) the principle of who knows?
Permanent magnetic chuck is designed by using the principle of superposition flux continuity principle and magnetic field of the permanent magnetic circuit design, magnetic chuck into a magnetic system, the relative motion of the magnetic system, realize the magnetic pole on magnetic field strength additive or cancellation, so as to achieve the purpose of holding and unloading.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords