• Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!! System 1
  • Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!! System 2
  • Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!! System 3
  • Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!! System 4
Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!

Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2 set
Supply Capability:
200 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

Place of Origin:

Shandong, China (Mainland)

Brand Name:

JIURUI

Model Number:

SJY0.3-16

Load Capacit:

300KG

Table Size:

3150*1800

lifting height:

16m

working height:

17.7m

Overall Dimensions3:

3700*2300*2950

(Optional)Voltage:

380 / 220/ 110 /415 v

Power:

2.2 kw

Net.weight:

3900KG

product name:

hydraulic platform of scaffolding

OEM:

yes





Packaging & Delivery

Packaging Details:

plywood for outside and plastic film for inside

Delivery Detail:

15working days after get the rest payments

 

Product Description

 

hydraulic platform of scaffolding for repairing in aerial work        

 

Main feature


1) lifting is stable

 
2) convenient operation

 
3) safety and creditbility

 

4)CE certificated

 

 

 

Parameter:

1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m

2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs

 

Safety: 
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs 
2. the limit switch system helps the lift to stop at accurate position.

3. all the work platforms are passed 1.2 times loading test before leaving factory.

4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.

 

Application:

1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.

2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.

3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon. 

 

Product List:

Model

Capacity

Table size

Max height

Work height

Total dimension

Net weight

SJY0.3-4

300Kgs

1500×750mm

4m

5.7m

1850×900×1900mm

400Kgs

SJY0.3-6

300Kgs

1500×750mm

6m

7.7m

1850×900×1970mm

650Kgs

SJY0.3-8

300Kgs

1650×1000mm

8m

9.7m

2100×1200×2460mm

1200Kgs

SJY0.5-8

500Kgs

1980×1220mm

8m

9.7m

2500×1550×2380mm

1400Kgs

SJY0.8-8

800Kgs

2000×1220mm

8m

9.7m

2600×1550×2640mm

1700Kgs

SJY0.3-10

300Kgs

2100×l220mm

10m

11.7m

2700×1550×2380mm

1500Kgs

SJY0.5-10

500Kgs

2100×l220mm

10m

11.7m

2700×1550×2380mm

1600Kgs

SJY1.0-10

1000Kgs

2220×l220mm

10m

11.7m

2820×1720×2850mm

2380Kgs

SIY0.3-12

300Kgs

2550×1500mm

12m

13.7m

3150×1860×2850mm

2580Kgs

SIY0.5-12

500Kgs

2550×1500mm

12m

13.7m

3150×1860×2850mm

2780Kgs

SJY1.0-12

1000Kgs

2600×1500mm

12m

13.7m

3200×2015×3090mm

3580Kgs

SJY0.3-14

300Kgs

2990×1600mm

14m

15.7m

3600×2000×2850mm

3000Kgs

SJY0.5-14

500Kgs

2990×1600mm

14m

15.7m

3600×2000×2850mm

3200Kgs

SJY0.3-16

300Kgs

3230×l600mm

16m

17.7m

3700×2000×3030mm

3900Kgs

SJY0.3-18

300Kgs

3230×l600mm

18m

19.7m

3700×2000×3250mm

4500Kgs

SJY0.3-20

300Kgs

3230×1600mm

20m

21.7m

3700×2000×3450mm

5100Kgs

 

We are different,because…

  • we offer a ‘one-stop-shop’ for all your EWP needs

  • we can supply a comprehensive range of access equipment for any business or budget

  • we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine

  • we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island

  • our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time

  • we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms

  • we keep a full service history on your machine free of charge

  • we provide loan machines during rebuilds and extended repair jobs to minimise downtime

  • we offer a full-service workshop in Christchurch and service the whole country

  • we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)

  • all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).

 


Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!

Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!

Scaffolding System Scissor Lift AndHydraulic Mobile Scaffolding Platform from CHIAN CNBM !!!


Q:The permanent magnet use principle
The working principle of permanent magnet lifting jack is the use of the principle of Faraday electromagnetic induction to manufacturing.
Q:The permanent magnet (permanent magnet sucker) the principle of who knows?
The working principle as shown in Figure 1, when the permanent magnet sucker pole in figure (a) state, lines from the N pole of the magnet, the yoke, through a ferromagnetic workpiece, back into the S pole of the magnet yoke. In this way, can make the workpiece firmly attracted to the permanent magnet sucker working faces. When the poles in the graph (b) state, lines to permanent magnet sucker work closed loop is composed of magnetic pole, the permanent magnet sucker inside, almost no lines from the permanent magnetic chuck work faces, so the workpiece does not produce suction, can smoothly unload.
Q:What important attention should be paid to large equipment?
Lifting tools are not allowed to exceed nameplate, safety check is carried out every month.
Q:Working principle of mechanical screw jack
Jack by the manpower through the screw drive, screw or nut sleeve as the top lift, jack screw thread self-locking action on the support, to avoid severe vibration should be top jack jack jack users to use process, according to the use of regular inspection and maintenance is made of high quality alloy steel material, more durable than similar products, as a commonly used lifting tool, Baoshan screw jack is a good helper to improve work efficiency. In the use of Jack, if only one, then be sure to select the weight of the center of gravity, and then point to the center of the jack, so as to prevent the lifting process in the tilt, resulting in accidents.
Q:What are the heavy lifting units commonly used in hoisting operations?
The commonly used wire rope phosphate coated steel wire rope, galvanized steel wire, stainless steel wire rope or coated steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope - double coating phosphating, phosphating coating to improve the wear resistance and corrosion resistance of steel wire that is not easy to wear and corrosion resistance is the reason for improving the service life of wire rope, wire rope is smooth be completely eliminated.
Q:What are the points for attention in the course of transportation of double beam cranes?
Component preparation, component preparation, including component counting, inspection and appearance modification, etc..(1) counting the components, including the type and quantity of the components, checking the order of the components according to the lifting sequence of the components, and determining the sequence of the loading of the components.(2) inspection component. Including size, geometry, the placement of parts and rings, and the stability of the location of the installation hole and the hole through the hole and so on.(3) check the weld seam of the steel structure. Including the weld size, appearance and connections whether the design and specifications meet the requirements, such as beyond the allowable error, should be taken effective measures to deal with.(4) appearance inspection and modification of components. Found defects and damage, such as cracks, pits, broken edge, weld length, height is not enough, weld ash or porosity, should be modified and after welding, to transport and use.
Q:Working principle of mechanical screw jack
Screw jack, also known as mechanical jack, is driven by the screw through the screw, screw or nut sleeve as a lifting device. Ordinary screw jack by thread self-locking function support heavy, simple structure, but the transmission efficiency is low, return slow. The self - lowering screw jack has no self-locking function and is equipped with a brake.
Q:Please explain how to prevent the safety accidents in the process of tower crane installation and disassembly
The tower crane (also known as the tower) with crane and tower body mutually vertical shape, so it can be installed in the nearby construction engineering and effective working range than other types of cranes. The working height of the tower crane can reach 100 ~ 160m, which is especially suitable for the construction of high-rise and super high-rise buildings. In addition, the operation is convenient and the amplitude is simple, and has been widely applied in the construction. However, due to the uneven assembly and disassembly or other reasons, tower crane safety accidents happen frequently. In view of the serious accidents occurring in the loading and unloading of tower cranes in recent years, this paper discusses the problems concerning installation, demolition, operation, maintenance and safety management of tower cranes.
Q:Is there a good steel lifting machine, the crane always binding steel plate, the efficiency is not high?
The easiest thing to do is to use a special hook for lifting iron (heavy lifting) and a manual magnetic sling under the wire rope.
Q:What are the points for attention in the course of transportation of double beam cranes?
Transportation conditions, transportation conditions, including on-site transportation, road construction, inspection and commissioning, etc..(1) construction of road transportation on site. According to the shipping component vehicle load size, body size, grade and standard requirements to determine the construction of temporary road pavement width and subgrade, pavement structure, construction site of the road transport people.(2) check the routes and routes. Transport drivers in Zhengzhou steel company and the relevant personnel along the exploration of transport routes, smooth road, road slope and road turning radius, or wire obstacles such as bridge and culvert clearance size are higher.(3) test run. The transport frame of the largest size component shall be installed on the vehicle, and the dimensions of the components shall be simulated and tested along the transport road.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords