Scaffolding Parts-Hot Dip Galvanized Brace End Thickness 3.25mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Hot Dip Galvanized Brace End Thickness 3.25mm
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Parts
Scaffolding Part Type: Other
certificate: SGS,ISO9001
color: silver or black gray
technology: galvanized, powder coated
Item | Scaffolding Diagonal Brace End |
Material | Q235 |
Dimensions | 0.66kg |
Standard | EN74 |
Note | OEM service is available |
MOQ | 1000pieces |
Package |
in steel pallet ,carton, plywood case, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
Futures of Hot Dip Galvanized Brace End Thickness 3.25mm
1) up to eight connections per joint
2) option to attach horizontals at right angles with high accuracy at the required level
3) free choice of angles between horizontals by using large or small connection gaps
4) load transfer aligned to axes with positive connections
5) the flat shape of the connection plate means no mortar, dirt, ice, grit blasting debris etc. can accumulate
6) high joint load capacity and stiffness
7) can be adapted to suit any plan shape and form of construction by using the variable connection options,
the choice of spans available and freely selectable scaffold height increments of 50 cm
8) hot dip galvanized surface for long lasting antirust ability
Packaging & Delivery of Hot Dip Galvanized Brace End Thickness 3.25mm
Packaging Detail: In steel pallet,or customized as your request.
Delivery Detail: 15days after received the down payment
Specifications of Hot Dip Galvanized Brace End Thickness 3.25mm
Timely delivery,
Lastingly Rustless,
Fracture performance advantages,
Strong ability to resist deformation
Ringlock System standard/48.3mm * 3.2mm
Description | Dim(L)mm | Weight (kg) |
1.0m | 1000mm | 4.99 |
1.5m | 1500mm | 7.8 |
2.0m | 2000mm | 9.7 |
3.0m | 3000mm | 14.41 |
4.0m | 4000mm | 19.12 |
The detail of the Diagonal brace end Thickness 3.25mm
Specifications | data |
material | Q235 |
technology | galvanized, powder coated |
certificate | SGS / ISO9001 |
weight | 0.66kg |
*other details see below pictures,the length can under your requestments |
About us
1.Enough production lines and workers to delivery on time.
2.Main product: Scaffolding System( Kwikstage, Cuplock, Ringlock, Haki); Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks, Frame System, Scaffold Steel Tubes, Accessories, Steel / Aluminum Planks etc.
3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.
4.Our products have passed the customer`s quality test,and the factories have thequality testing instruments.
5.OEM Service
6.Rizhao is a coastal city with convenient transportation.
7.Provide good service for everyone.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q: The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Hot Dip Galvanized Brace End Thickness 3.25mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords