• Modular Steel Frame Formwork SF-120 System 1
  • Modular Steel Frame Formwork SF-120 System 2
  • Modular Steel Frame Formwork SF-120 System 3
Modular Steel Frame Formwork SF-120

Modular Steel Frame Formwork SF-120

Ref Price:
$220.00 / m² get latest price
Loading Port:
XINGANG
Payment Terms:
TT or LC
Min Order Qty:
55 Cubic Meters m²
Supply Capability:
5000 Cubic Meters per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Modular Steel frame Formwork SF-120


 

Type:  Plywoods 

 

Place of Origin:  China (Mainland) 

 

Brand Name:  CMAX
 
Usage:  Outdoor 

 

Grade:  First-Class 

 

Main Material:  Poplar 

 

Formaldehyde Emission Standards:  E1 

 

Plywood Type:  13-Ply Boards 

 

Film:  black,brown,red,anti-slip 
 
Core:  poplar,hardwood,eucalyptus,combi,birch 

 

Glue:  melamine WBP,phenolic

 

WBP  Size:  1220*2440mm,1250*2500mm 

 

Thickness:  9mm,12mm,15mm,18mm,21mm 

 

Pressing:  1 time,2 times 

 


Packaging & Delivery Modular Steel frame Formwork SF-120

 


Packaging Detail: inner with plastic bag,outer with carton board or thin plywood then fastened by steel belts with pallet

 

Delivery Detail: Within 15 days after receiving deposit or original L/C at sight

 


Specifications Modular Steel frame Formwork SF-120

 


1)Film:brown,black,red,anti-slip

 

2)Core:poplar,hardwood,combi,birch

 

3)Glue:melamine WBP,phenolic WBP

 

4)Useage:construction


 

Item

Film faced plywood/Marine plywood/Construction plywood

Face/Back

Brown film,Black Film,Red film,Anti-slip film

Core

Poplar,hardwood,Eucalyptus, Poplar, Birch

Glue

Melamine WBP glue,Phenolic WBP glue

Size(mm)

1220×2440mm,1250×2500mm or as request

Thickness(mm)

9mm,12mm,15mm,18mm,21mm

Moisture

6-12%

Thickness tolerance

+/-0.5mm

 

Packing

inner with plastic bag,outer with carton board or thin plywood then fastened by 4×6 lines steel belts with pallet

Quantity

20’GP

8 plts/22M3

40’GP

16 plts/48M3

40’HQ

18 plts/55M3

Useage

Using for making construction, industry

MOQ

1×40'HQ

Payment Terms

TT:30% deposit, the balance agaist B/L copy

L/C: irrevocable L/C at sight

Delievery Time

Within 15 days after receiving 30% deposit or original L/C at sight

 

 

 

 

 

Q: What are the maintenance and maintenance of hydraulic climbing formwork
Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
Q: Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords