• Scaffolding Parts-Hot  Dip Galvanized Brace End Thickness 3.75mm System 1
  • Scaffolding Parts-Hot  Dip Galvanized Brace End Thickness 3.75mm System 2
  • Scaffolding Parts-Hot  Dip Galvanized Brace End Thickness 3.75mm System 3
Scaffolding Parts-Hot  Dip Galvanized Brace End Thickness 3.75mm

Scaffolding Parts-Hot Dip Galvanized Brace End Thickness 3.75mm

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
10000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Hot Dip Galvanized Brace End Thickness 3.75mm

 

Place of Origin:  China (Mainland) 

 

Brand Name:  CMAX 

 

Type:  Scaffolding Parts 

 

Scaffolding Part Type:  Other 

 

certificate:  SGS,ISO9001 

 

color:  silver or black gray 

 

technology:  galvanized, powder coated

 

Item

Scaffolding Diagonal Brace End

Material

Q235

Dimensions

0.66kg

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

 

in steel pallet ,carton, plywood case, or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

 

Futures of Hot Dip Galvanized Brace End Thickness 3.75mm

 

1) up to eight connections per joint  

  
2) option to attach horizontals at right angles with high accuracy at the required level   

 
3) free choice of angles between horizontals by using large or small connection gaps   

 

4) load transfer aligned to axes with positive connections    

 
5) the flat shape of the connection plate means no mortar, dirt, ice, grit blasting debris etc. can accumulate    

 
6) high joint load capacity and stiffness    


7) can be adapted to suit any plan shape and form of construction by using the variable connection options,

    the choice of spans available and freely selectable scaffold height increments of 50 cm  

  
8) hot dip galvanized surface for long lasting antirust ability


 

 

Packaging & Delivery of Hot Dip Galvanized Brace End Thickness 3.75mm

 

Packaging Detail: In steel pallet,or customized as your request.

 

Delivery Detail: 15days after received the down payment

 

 

Specifications of Hot Dip Galvanized Brace End Thickness 3.75mm

 

Timely delivery,

 

Lastingly Rustless,

 

Fracture performance advantages,

 

Strong ability to resist deformation

 

Ringlock System standard/48.3mm * 3.2mm

Description

Dim(L)mm

Weight (kg)

1.0m

1000mm

4.99

1.5m

1500mm

7.8

2.0m

2000mm

9.7

3.0m

3000mm

14.41

4.0m

4000mm

19.12

 

 

The detail of the Diagonal brace end Thickness 3.75mm

 

Specifications

data

material

Q235

technology

galvanized, powder coated 

certificate

SGS / ISO9001

weight

0.66kg

 *other details see below pictures,the length can under your requestments

 

About us

 

1.Enough production lines and workers to delivery on time.

 

2.Main product: Scaffolding System( Kwikstage, Cuplock, Ringlock, Haki); Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks, Frame System, Scaffold Steel Tubes, Accessories, Steel / Aluminum Planks etc.

 

3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.

 

4.Our products have passed the customer`s quality test,and the factories have thequality testing instruments.

 

5.OEM Service

 

6.Rizhao is a coastal city with convenient transportation.

 

7.Provide good service for everyone.

 

 

 

Q:What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Q:The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords