Scaffolding Parts-Prop Pin in Steel Material
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding Parts-Prop Pin in Steel Material
1.Structure of Scaffolding Prop Pin with Nut
Scaffolding Prop Pin is Scaffolding parts, Material is Q235 steel,using with prop sleeve for adjustable. Surface Finish: natural colour or zinc plate or painting or others.
Sizes: dia 10mm, 12mm, 14mm, 16mm, 18mm
2. Scaffolding Prop Pin with Nut Products pictures:
3. Scaffolding Prop Pin with Nut Specification:
1) Surface: natural,galvanizing,or painting
2) Sizes as per customer demand
3) Prop's parts
4) Samples are available
4.FAQ
We have organized several common questions for our clients, may help you sincerely:
1) How is the Packaging Details?
In bags or as the requirement of customers.
2) How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
5.Factory introduction
We are a professional manufacturer and supplier of Scaffolding,Scaffolding coupler,Frame System, Formwork system, Hand Tools, and other scaffolding and formwork accessory.
Features:
1. Surface treatment: Hot Dip Galvanized, Electric Galvanized(Silver color and Gold color),Self Color
2. Certificate: EN74,IS09001:2000,MPA,CE
3. OEM service can be provided.
- Q: What are the characteristics of disc scaffolding
- . Disc scaffolding and scaffolding, also called Leiya frame, disk type scaffolding, socket type, scaffolding, system frame. The main features are: disc type scaffold surface treatment: the main parts of the internal and external advanced hot galvanized anti-corrosion technology, which can improve the service life of the product, and provide further guarantee for safety, at the same time to reach a beautiful, beautiful disc scaffolding capacity
- Q: Cantilever scaffold technical disclosure
- First, the foot of the structure of the quality standards:1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.
- Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: opinions on scaffolding piercing and how to hide it from school :)?
- Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
- Q: What are the main safety problems when dismantling the scaffold
- 5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
- Q: I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
- You should be using non ionised sea salt dissolved in warm to hot water twice a day to clean the piercing, not savlon (which is to harsh for piercings and will dry out the skin). If the piercing keeps getting caught then it is going to swell and be painful, the area has been through trauma so will be very sensitive. Although swelling at this early stage is still normal and to be expected.
- Q: Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
- conch would look great and not make it look to cluttered go for it :)
- Q: Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
- i twisted mine alot and the cartlidge inbetween has ripped and it hurts unbelievably loads, so i wouldnt twist it
- Q: I got an industrial/scaffold piercing a few months ago and currently have captive bead rings in (The piercer put those in after he pierced it). The piercings are now healed enough for me to change the piercing, and I found an industrial bar on ebay which I'd really like to order. Only problem is, it has two choices on the gauge thickness and length, and I don't know which mine is.The gauge sizes available are 1.2mm (16g) or 1.6mm (14g) , and the length options are 32mm, 35mm, 38mm.Does anyone know which would be the best to get? Thanks.
- I originality did not read the entire introductory question, and was going to tell you to speak with your suppliers representative. LOL As if you were doing actual scaffold work. Thx for reading my irrelevant answer!!! LOL
Send your message to us
Scaffolding Parts-Prop Pin in Steel Material
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords