Scaffolding Parts-Cold Galvanized Bolt
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 50000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-Cold Galvanized Bolt
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Accessories
Material: Low Carbon Steel, 35K, Q235, C1010, C1008 etc.
Size: Customize as per your needs.
Color: Silver, Gold, Self-color or painted as per your order.
Grade: 4.8 , 5.8 , 6.8 , 8.8 , 10.9 etc.
Standard: DIN931, DIN933, DIN934
Lead time: Within 20 days
Package: Boxes or cartons then on pallet
Service: OEM service is available.
Packaging & Delivery of Scaffolding Parts-Cold Galvanized Bolt
Packaging Detail: Cartons or boxes then on pallet, or as per your need.
Delivery Detail: Within 20 days
Specifications of Scaffolding Parts-Cold Galvanized Bolt
Bolts for Scaffolding Coupler
All size can be avaiable.
Grade:4.8/5.8/6.8/8.8/10.9etc.
stable Standard:DIN931 DIN933 DIN934
Bolts for Scaffolding Coupler
scaffolding bolt standard |
DIN 787,JB 1709,JIS B 1166 etc or as per your need. |
scaffolding bolt size |
M5-M48 or accept your design and OEM . |
Scaffolding bolt Materials |
1.Stainless Steel: SS201, SS303, SS304, SS316, SS410 2.Steel:C45(K1045), C46(K1046),C20 3.Brass:C36000 ( C26800), C37700 ( HPb59) 4.Aluminum: Al6061, Al6063 etc 5.Carbon steel: C1006,C1010,C1018,C1022 |
scaffolding bolt Surface treatment |
Plain, Black Oxide, nickel plated, Chromated, passivated, zinc plating, phosphated and etc as per your need. |
scaffolding bolt Manufacturing Process |
Heading/Threading/Secondarymachine/heat treatment/plating/Anti-slipping/Baking/QA/Package/Shipping |
scaffolding bolt Special report |
Free PPAP or FMEA report for automobiles industry. other SGS report can be provided as per your need. |
About us
1.Enough production lines and workers to delivery on time.
2.Main product: Scaffolding System( Kwikstage, Cuplock, Ringlock, Haki); Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks, Frame System, Scaffold Steel Tubes, Accessories, Steel / Aluminum Planks etc.
3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.
4.Our products have passed the customer`s quality test,and the factories have thequality testing instruments.
5.OEM Service
6.Rizhao is a coastal city with convenient transportation.
7.Provide good service for everyone.
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b)Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Cold Galvanized Bolt
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 50000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords