Formwork System-H20 Timber Beam With Length 6000 mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 100 Meter/Meters m
- Supply Capability:
- 6000 Meter/Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Formwork System-H20 Timber Beam With Length 6000 mm
Place of Origin: China (Mainland)
Brand Name: CMAX
Model Number: CMAX-H20 Beam
Height: 200mm
Flange: 80*40mm
Web: 27-30mm
Weight: 4.6-5.2kg
Size: 6000 mm
Shear Force: q=11KN
Permissible Bending Moment: m=5.0KN*M
Feature: Hot-Sale Timber Beam H20
Usage: Formwork System
HS Code: 84806000
Product Name | H20 Timber Beam |
Height | 200mm |
Flange | Wide*Thickness=80mm*40mm |
Spruce, Pine, a mixture of wood species permitted | |
Web | Thickness:27-30mm |
3-plywood or plywood | |
Surface Protection | The complete beam is waterproofed using a water-repellent color glaze |
Weight | 4.6-5.2kg |
Standard Lengths | 2.45m,2.65m,2.9m,3.3m,3.6m,3.9m,4.2m,4.5m,4.9m,5.9m, (Max.length:6.00m) |
Shear Force | q=11KN |
Permissible Bending Moment | m=5.0KN*M |
Package | Customized Package,or In Bulk |
Used for | Slab Formwork System,Vertical Formwork(Wall,Column,Hydraulic Climbing etc.), Adjustable Arced Formwork etc |
1.material:poplar,pine,birch,hardwood
2.glue:WBP-phenolic,Melamine waterproof glue
3.usage:construction
H20 Timber Beam:
1.H20 timber beam widely applied to concrete formwork construction,used together with prop,tripod,forkhead.
2.Flange is made of spruce or radiata pin,finger-jointed into the web.Web is 3-layer plywood.
3.Timber beam is waterproof using a water-repellent color glaze.
4.The length of h20 timber beam can be 2.45m,2.9m,3.3m,3.9m,4.9m and 5.9m.Max length is 6m.
5.The end of beam can be sealed to protect moisture,reduce damage,increase service life.
Packaging & Delivery of Formwork System-H20 Timber Beam With Length 6000 mm
Packaging Detail: Could be done as customers' request
Delivery Detail: About 15-25 days on receipt of your payment
Specifications of Formwork System-H20 Timber Beam With Length 6000 mm
1.Timber Beam H20 For Formwork
2.Used in Formwork System
3.Water proof, acid proof and alkali proof
4.Length:2.45m-6m
CMAX Formwork System Timber Beam H20/Timber Beam H20 For Formwork
Introduction of Formwork System-H20 Timber Beam With Length 6000 mm
1. With low weight, high rigidity and water proof, timber beam H20 is one of the most important components in the formwork system all over the world. It can be repeated used for many times, which save much cost.
2. Timber beam can be widely used in slab formwork system, vertical formwork (wall, column, hydraulic climbing etc.), adjustable arced formwork etc.
3. Timber beam system is easy to operation and can be assembled in different size and shape of formwork within certain range. The max. pouring height can be over 10 meters. As the lower weight of the materials, the formwork is much lighter than steel formwork.
4. With high standard components, the formwork can be repeated used for many times.
5. The wing board is using dried pine with a percentage of moisture below 13%. The wing board is composed of many pcs of short pine by using special adhesive to avoid the internal shear force. The web board is using plywood.
6. The surface of the timber beam is water proof, acid proof and alkali proof.
H20 Beam Timber For Construction/Formwork H20 Timber Beam:
1> if used abide by the illustrations strictly, it can be reused many times.
2> reducing the cost greatly and avoiding the disadvantage:restily and erosive of iron mould.
3> solve the problems of leaking and rough surface during constructing process
4> realizing a higher economic profies.
5> new technology and materials are being introduced and popularized continuously for construction...........
Supply H20 beam--4 years experience, with competitive price and good quality
* Pine LVL flange + pine plywood web
* WBP phenolic resin
* Environment friendly Yellow painting: waterproof, fireproof, rot-proof and frozen-proof
why you choose us
1.Competitive price
providing quality products, excellent service, competitive pirces and prompt delivery.
2.High and stable quality
a)Our professional technology,skillful workers and strict production management.
b)We have our own quality control system and professtional quality inspectors.
3. If put in boiling water for 48 hours, it is still glue-sticking and non-deformed
4. if you have doubt on our products, we have free samples for you or you can come to visit us.
5. Runde will responsible for any problem, we can provide you warranty assurance.
6. experienced sales team on you service all time.
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b)Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Formwork System-H20 Timber Beam With Length 6000 mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 100 Meter/Meters m
- Supply Capability:
- 6000 Meter/Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches