• Scaffolding Parts-Hot Dip Galvanized Jack Nut System 1
  • Scaffolding Parts-Hot Dip Galvanized Jack Nut System 2
  • Scaffolding Parts-Hot Dip Galvanized Jack Nut System 3
Scaffolding Parts-Hot Dip Galvanized Jack Nut

Scaffolding Parts-Hot Dip Galvanized Jack Nut

Ref Price:
$1.45 / pc get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
5000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Scaffolding Parts-hot dip galvanized Jack Nut

Place of Origin:  China (Mainland) 

Model Number:  Jack Nut 

Jack Nut:  Jack Nut 

Material:  Cast Mellable 

Weight:  0.64kg 

Sueface:  Self-color 

Packaging & Delivery Scaffolding Parts-hot dip galvanized Jack Nut

Packaging Detail: In Carton

Delivery Detail: 30 Days After Deposite.

Specifications of Scaffolding Parts-hot dip galvanized Jack Nut

Scaffolding Jack Nut

1) Forged scaffolding jack nut

2) Dimensions: Dia35/38mm

3) Surface: galvanized hot dip galvanized

Scaffolding Jack Nut

Details of Scaffolding Parts-hot dip galvanized Jack Nut:

1. Raw Material: drop forged carbon steel

2. Weight: 0.64kg

3. Dimensions: Dia35/38mm

4. Professional Manufacturer

5. Standards: BS1139 (1982 & 1991), EN74 class A & B

6. Surface treatment: Hot dip galvanized

We can also manufacture as per customers’ drawings

Our Advantages:

The biggest supplier for various kinds of  formwork systems in China

The first can produce drop forged 316 stainless steel shackle, turnbuckle, wire rope clip and eye bolts in China

The supplier of Wal-Mart from 2003

Drop forged Germany type coupler have passed Wilhelm layher Gmbh test Which is the leading scaffolding company in Europe

 

Produce Advantages:

Products standard

Our rigging hardware meet US type, DIN type, JIS type, BS type

Production facilities

We have forging press machine 300 T, 400 T, 630 T, 1000 T ,1600 T. 8 forging line. The biggest forged products we produce is 500 kgs.

Inspection equipment

Breaking Test Machine, Chemical Analysis Machine, Fatigue Test Machine, Hardness Test Machine

 

About us:

A) We have much experience in designing and producing the Scaffolding Parts-hot dip galvanized Jack Nut.

B) Our pruducts are widely exported to more than 10 countries and regions and very popular among US , the Middle East, South America and Europe and so on.

C) our mission is "quality priority and customer first" .

Our products and services have received good evaluations from customers.

 

We are specializes in designing & manufacturing of various kinds of  formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.

All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

 Scaffolding Parts-hot dip galvanized Jack Nut

 Scaffolding Parts-hot dip galvanized Jack Nut

 Scaffolding Parts-hot dip galvanized Jack Nut

Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
Q: Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b) Factory Information
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords