• Formwork System-H20 Timber Beam With Length 3600 mm System 1
  • Formwork System-H20 Timber Beam With Length 3600 mm System 2
  • Formwork System-H20 Timber Beam With Length 3600 mm System 3
Formwork System-H20 Timber Beam With Length 3600 mm

Formwork System-H20 Timber Beam With Length 3600 mm

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
100 Meter/Meters m
Supply Capability:
6000 Meter/Meters per Month m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Formwork System-H20 Timber Beam With Length 3600 mm

 

Place of Origin:  China (Mainland) 

Brand Name:  CMAX 

Model Number:  CMAX-H20 Beam 

Height:  200mm 

Flange:  80*40mm 

Web:  27-30mm 

Weight:  4.6-5.2kg 

Size:  3600 mm 

Shear Force:  q=11KN 

Permissible Bending Moment:  m=5.0KN*M 

Feature:  Hot-Sale Timber Beam H20 

Usage:  Formwork System 

HS Code:  84806000

 

Product Name

H20 Timber Beam

Height

200mm

Flange

Wide*Thickness=80mm*40mm

Spruce, Pine, a mixture of wood species permitted

Web

Thickness:27-30mm

3-plywood or plywood

Surface Protection

The complete beam is waterproofed using a water-repellent color glaze

Weight

4.6-5.2kg

Standard Lengths

2.45m,2.65m,2.9m,3.3m,3.6m,3.9m,4.5m,4.9m,5.9m, (Max.length:6.00m)

Shear Force

q=11KN

Permissible Bending Moment

m=5.0KN*M

Package

Customized Package,or In Bulk

Used for

Slab Formwork System,Vertical Formwork(Wall,Column,Hydraulic Climbing etc.), Adjustable Arced Formwork etc

 

1.material:poplar,pine,birch,hardwood

2.glue:WBP-phenolic,Melamine waterproof glue

3.usage:construction

 

H20 Timber Beam:

1.H20 timber beam widely applied to concrete formwork construction,used together with prop,tripod,forkhead.

2.Flange is made of spruce or radiata pin,finger-jointed into the web.Web is 3-layer plywood.

3.Timber beam is waterproof using a water-repellent color glaze.

4.The length of h20 timber beam can be 2.45m,2.9m,3.3m,3.9m,4.9m and 5.9m.Max length is 6m.

5.The end of beam can be sealed to protect moisture,reduce damage,increase service life.

 

Packaging & Delivery of Formwork System-H20 Timber Beam With Length 3600 mm

 

Packaging Detail: Could be done as customers' request

Delivery Detail: About 15-25 days on receipt of your payment

 

Specifications of Formwork System-H20 Timber Beam With Length 3600 mm

 

1.Timber Beam H20 For Formwork

2.Used in Formwork System

3.Water proof, acid proof and alkali proof

4.Length:2.45m-6m

 

CMAX Formwork System Timber Beam H20/Timber Beam H20 For Formwork

 

 

Introduction of Formwork System-H20 Timber Beam With Length 3600 mm

 

 

1. With low weight, high rigidity and water proof, timber beam H20 is one of the most important components in the formwork system all over the world. It can be repeated used for many times, which save much cost.

2. Timber beam can be widely used in slab formwork system, vertical formwork (wall, column, hydraulic climbing etc.), adjustable arced formwork etc.

3. Timber beam system is easy to operation and can be assembled in different size and shape of formwork within certain range. The max. pouring height can be over 10 meters. As the lower weight of the materials, the formwork is much lighter than steel formwork.

4.  With high standard components, the formwork can be repeated used for many times.

5.  The wing board is using dried pine with a percentage of moisture below 13%. The wing board is composed of many pcs of short pine by using special adhesive to avoid the internal shear force. The web board is using plywood.

6. The surface of the timber beam is water proof, acid proof and alkali proof.

 

H20 Beam Timber For Construction/Formwork H20 Timber Beam:

1> if used abide by the illustrations strictly, it can be reused many times.

2> reducing the cost greatly and avoiding the disadvantage:restily and erosive of iron mould.

3> solve the problems of leaking and rough surface during constructing process

4> realizing a higher economic profies.

5> new technology and materials are being introduced and popularized continuously for construction...........


Supply H20 beam--4 years experience, with competitive price and good quality,

they are well selled in all around the world.

 

* Pine LVL flange + pine plywood web
* WBP phenolic resin
* Environment friendly Yellow painting: waterproof, fireproof, rot-proof and frozen-proof

 

why you choose us

 

1.Competitive price

providing quality products, excellent service, competitive pirces and prompt delivery.

2.High and stable quality

  a)Our professional technology,skillful workers and strict production management.

  b)We have our own quality control system and professtional quality inspectors.

3. If put in boiling water for 48 hours, it is still glue-sticking and non-deformed

4. if you have doubt on our products, we have free samples for you or you can come to visit us.

5. Runde will responsible for any problem, we can provide you warranty assurance.

6. experienced sales team on you service all time.

 

 

 

 

Q: What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q: Advantages and disadvantages of climbing frame and floor type scaffold
Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b) Factory Information
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches